Case Summary (MEC) | | | 6/6/2014 | | DONE |
Barbara Stitt
|
|
|
|
Final | 11/2/2012 | 11/2/2012 | 11/2/2012 | P | PASS |
Bill VanDegrift
|
|
|
|
Final | 11/2/2012 | 11/2/2012 | 11/2/2012 | P | NH |
Bill VanDegrift
|
|
|
>> Inspection requested via web by Bryan Palmer no access left notice
|
Rough-in | 8/1/2012 | 8/2/2012 | 8/2/2012 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bryan Palmer-20 lb gas test pass.
|
Pressure Test | 7/23/2012 | 7/23/2012 | 7/23/2012 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bryan Palmer-need to gas pipe and test.
|
Rough-in | 7/23/2012 | 7/23/2012 | 7/23/2012 | P | PART |
Eric Strole
|
|
|
please inspect for rough in/cover. furnace in mechanical room to be completed after drywall. there is no central air in the basement, heat will be provided with wall baseboards, no ac. Ductwork visible will be abandon in place or removed by builder prior to insulating/sheet rock Phone #: ###-#### >> Inspection requested via web by Bryan Palmer-need to gas pipe
|
Rough-in | 7/2/2012 | 7/3/2012 | 7/3/2012 | P | PART |
Alan Hauser
|
|
|
upstairs ok, not finished in basement and NO GAS PIPE RUN
|
Issue PAID IN FULL permit | | | 6/13/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/13/2012 | | DONE |
|
|
|
This permit was created on the web by Bryan Palmer
|