Final | 7/27/2012 | 7/30/2012 | 7/30/2012 | A | PASS |
Dixie Fellows
|
|
|
Chimney has been cleaned. Check has been written out and we are up and running now.
thanks Brian Phone #: ###-#### >> Inspection requested via web by Brian Preece
|
Final | 7/23/2012 | 7/23/2012 | 7/23/2012 | P | FAIL |
Dixie Fellows
|
|
|
Manual has been left. States in manual, gas log approved for all solid fuel chimneys. We''re good to go with the gas log. Thanks for having me do a double check Dixie Phone #: ###-#### >> Inspection requested via web by Brian Preece...manufacturer specs state that chimney must be cleaned out before gas log is used..this chimney hasn't been cleaned
|
Pressure Test | 7/17/2012 | 7/18/2012 | 7/18/2012 | A | PASS |
Dixie Fellows
|
|
|
second pressure gauge placed on. Air holding for the duration of installers being there. 40-45 minutes. No drop at all on pressure. Phone #: ###-#### >> Inspection requested via web by Brian Preece...20lb gas to future gas log ok
|
Pressure Test | 7/16/2012 | 7/16/2012 | 7/16/2012 | P | FAIL |
Dixie Fellows
|
|
|
re-inspection- new gauge placed on. Held pressure for half n hour before leaving. Phone #: ###-#### >> Inspection requested via web by Brian Preece...leak
|
Pressure Test | 7/12/2012 | 7/13/2012 | 7/13/2012 | A | FAIL |
Dixie Fellows
|
|
|
gas pressure test Phone #: ###-#### >> Inspection requested via web by Brian Preece...leak
|
Issue PAID IN FULL permit | | | 7/12/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/12/2012 | | DONE |
|
|
|
This permit was created on the web by Brian Preece
|