Final | 8/27/2012 | 8/27/2012 | 8/27/2012 | P | PASS |
Eric Strole
|
|
|
Air balance was done this morning. Phone #: ###-#### >> Inspection requested via web by April Thomas
|
Rough-in | 7/20/2012 | 7/20/2012 | 7/20/2012 | P | PASS |
Eric Strole
|
|
|
|
Rough-in | 7/19/2012 | 7/20/2012 | 7/20/2012 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by April Thomas-need approved-stamped manual-j on site for rough-in inspection.
|
Pressure Test | 7/19/2012 | 7/20/2012 | 7/20/2012 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by April Thomas-20 lb gas test pass.
|
Pressure Test | 7/19/2012 | 7/20/2012 | 7/19/2012 | P | CANC |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by April Thomas Inspection cancelled from web by: April Thomas
|
Rough-in | 7/19/2012 | 7/20/2012 | 7/19/2012 | P | CANC |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by April Thomas Inspection cancelled from web by: April Thomas
|
Issue PAID IN FULL permit | | | 7/16/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/16/2012 | | DONE |
|
|
|
This permit was created on the web by April Thomas
|