First Notice | 11/1/2012 | 11/1/2012 | 3/4/2013 | | DONE |
Dixie Fellows
|
|
|
|
Print Statement | | | 3/4/2013 | | DONE |
Tisha Gallop
|
|
|
mailed to Source Refrig
|
Final | 11/1/2012 | 11/1/2012 | 11/1/2012 | P | PASS |
Dixie Fellows
|
|
|
contact griff with any questions...signed the card
|
Pressure Test | 10/18/2012 | 10/19/2012 | 10/19/2012 | A | PASS |
Dixie Fellows
|
|
|
Pressure test B rack refrigertion. Site contact Griff Stallings 208 ###-#### Phone #: ###-#### >> Inspection requested via web by Preston Schulthies...loop B and C OK AT 100LBS
|
Pressure Test | 10/11/2012 | 10/12/2012 | 10/12/2012 | A | PART |
Dixie Fellows
|
|
|
Griff Stalling will be the onsite contact. This will system A refrigeration. Phone #: ###-#### >> Inspection requested via web by Preston Schulthies...test on A LOOP REFRIG. LINES OK
|
Fees Due Hold | 8/4/2012 | | 9/11/2012 | | DONE |
Christina Prado
|
|
|
|
Rough-in | 7/30/2012 | 7/31/2012 | 7/31/2012 | A | PASS |
Troy James
|
|
|
grif Phone #: ###-#### ok all underground refrigeration incased in pvc piping
|
Conference | 7/30/2012 | 7/30/2012 | 7/30/2012 | P | CANC |
Dixie Fellows
|
|
|
###-####....grift has called about an inspection they thought was scheduled last friday..i told him it was never scheduled, so he will reschedule and attach this permit to the building permit
|
Issue PAID IN FULL permit | | | 7/24/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 7/24/2012 | | |
|
|
|
|
Application received | | | 7/24/2012 | | DONE |
|
|
|
This permit was created on the web by Alana Sterns
|