Final | 11/29/2012 | 11/30/2012 | 11/30/2012 | P | PASS |
Dixie Fellows
|
|
|
call before to meet//Pam Phone #: ###-####
|
Final | 8/29/2012 | 8/30/2012 | 8/30/2012 | A | NR |
Dixie Fellows
|
|
|
Steve Phone #: ###-####
|
Rough-in | 8/29/2012 | 8/30/2012 | 8/30/2012 | A | PASS |
Dixie Fellows
|
|
|
Steve Phone #: ###-####
|
Pressure Test | 8/20/2012 | 8/21/2012 | 8/21/2012 | P | PART |
Dixie Fellows
|
|
|
Steve Phone #: ###-####...20lb gas ok...need outside air duct brought into kitchen for new exhaust on 150,000 btu cook-top....called darrel d. to approve connection on electrical as he had already given them a pass on the elec r/i
|
Application received | | | 8/20/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/20/2012 | | DONE |
|
|
|
|