Final | 4/16/2013 | 4/17/2013 | 4/17/2013 | A | PASS |
Dixie Fellows
|
|
|
Please call Brad at ###-#### if any questions or issues. Thanks. Phone #: ###-#### >> Inspection requested via web by Brad Allison
|
Final | 4/15/2013 | 4/16/2013 | 4/16/2013 | A | NR |
Dixie Fellows
|
|
|
Please call Brad at ###-#### if any questions or issues. Thanks. Phone #: ###-#### >> Inspection requested via web by Brad Allison...brad will get the revised MANUAL J on site and re-call
|
Rough-in | 1/8/2013 | 1/9/2013 | 1/9/2013 | P | PASS |
Eric Strole
|
|
|
Blast test being done 1/9 at 2pm by 3rd party if need to witness. Please call Brad at ###-#### if any questions. Phone #: ###-#### >> Inspection requested via web by Brad Allison-20 lb gas test and rough-in pass. (ON FINAL NEED TO CHECK FOR MISSING SUPPLY IN GREAT ROOM AND EXTRA SUPPLY IN MASTER BEDROOM)
|
Rough-in | 1/2/2013 | 1/3/2013 | 1/3/2013 | A | FAIL |
Eric Strole
|
|
|
Need Partial Rough-In Inspection with approval to proceed - crawl is not complete until insulation is done. Please call Brad at ###-#### if any questions. Phone #: ###-#### >> Inspection requested via web by Brad Allison-need to complete rough-in (crawl) before calling for inspection. 20 lb gas test pass.
|
Rough-in | 12/28/2012 | 12/31/2012 | 12/29/2012 | P | CANC |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison Inspection cancelled from web by: Brad Allison
|
Pressure Test | 10/24/2012 | 10/25/2012 | 10/25/2012 | A | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison....10' of u//g to built in bbq at back of house ok
|
Issue PAID IN FULL permit | | | 10/24/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/24/2012 | | DONE |
|
|
|
This permit was created on the web by Brad Allison
|