Final | 12/9/2013 | 12/9/2013 | 12/9/2013 | P | PASS |
Dixie Fellows
|
|
|
call 30min ahead ###-####
|
Final | 12/6/2013 | 12/9/2013 | 12/9/2013 | A | NH |
Dixie Fellows
|
|
|
PLease call at least 30 mins prior to inspection-Eric Phone #: ###-####...he rescheduled for pm
|
Mec-Aging Inspection | 9/27/2013 | 9/27/2013 | 9/27/2013 | | PEND |
Dixie Fellows
|
|
|
called eric and left a message...i also called the g/c and he is no longer on ths job
|
Rough-in | 2/14/2013 | 2/15/2013 | 2/15/2013 | A | PASS |
Dixie Fellows
|
|
|
early as possible//Eric Phone #: ###-####
|
Rough-in | 2/12/2013 | 2/13/2013 | 2/13/2013 | P | PART |
Dixie Fellows
|
|
|
Brian Phone #: ###-####....100lb hydronic test for 2nd floor ok...mini splits ok...bath exhausts ok...will check dryer vent and tankless w/h on next inspection
|
(F) Reprint permit | | | 2/8/2013 | | DONE |
Barbara Stitt
|
|
|
|
Rough-in | 11/16/2012 | 11/19/2012 | 11/19/2012 | A | PART |
Dixie Fellows
|
|
|
call first//radiant tubing in basement//Eric Phone #: ###-####...100lb test on hydronics in basement ok...all insulated as well
|
Application received | | | 11/16/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/16/2012 | | DONE |
|
|
|
|