Final | 2/4/2013 | 2/5/2013 | 2/5/2013 | A | PASS |
Bill VanDegrift
|
|
|
Eric, I have paid the reinspect fee and our builder has confirmed that the balance report is on the furnace as of today.
Thank you, >> Inspection requested via web by Stephanie Brown met on site with city staff and contractor, discussed ways to make inspections run smoother.
|
Conference | 2/4/2013 | 2/4/2013 | 2/5/2013 | P | DONE |
Eric Strole
|
|
|
9:30
|
Fees Due Hold | 1/31/2013 | | 2/4/2013 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/4/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Final | 1/30/2013 | 1/31/2013 | 1/31/2013 | A | PEND |
Eric Strole
|
|
|
Re-inspec to see balance report is on site. Phone #: ###-#### >> Inspection requested via web by Stephanie Brown-Hold on permit, cannot inspect till reinspection fee is paid and hold is taken off.
|
Final | 1/29/2013 | 1/30/2013 | 1/30/2013 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Stephanie Brown-NO AIR BALANCE REPORT. TOOK PICTURE OF FURNACE.
|
Reinspection Fee (no hold) | 1/30/2013 | 1/30/2013 | 1/30/2013 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Stephanie Brown-NO AIR BALANCE REPORT. TOOK PICTURE OF FURNACE.
|
Rough-in | 12/26/2012 | 12/27/2012 | 12/27/2012 | P | PASS |
Eric Strole
|
|
|
1:00 duct blast-20 lb gas test, duct blast and rough-in pass.
|
Rough-in | 12/21/2012 | 12/26/2012 | 12/26/2012 | P | NR |
Eric Strole
|
|
|
Pls call Scott for confirmation to b there for blasting @ 1:00PM Phone #: ###-#### >> Inspection requested via web by Stephanie Brown
|
Issue PAID IN FULL permit | | | 12/18/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/18/2012 | | DONE |
|
|
|
This permit was created on the web by Stephanie Brown
|