First Notice | 11/5/2013 | 11/5/2013 | 2/9/2015 | | DONE |
Troy James
|
|
|
|
Print Statement | | | 2/9/2015 | | DONE |
|
|
|
|
Final | 11/4/2013 | 11/5/2013 | 11/5/2013 | A | PASS |
Troy James
|
|
|
JOB CONTACT IS COLI Phone #: ###-#### >> Inspection requested via web by ADAM WARR
|
Final | 10/31/2013 | 11/1/2013 | 11/1/2013 | P | PART |
Troy James
|
|
|
contact is Colin ###-#### Phone #: ###-#### >> Inspection requested via web by LENNIE BUSS need to check to see if over protection device required downstream of gas regulator
|
Pressure Test | 10/15/2013 | 10/16/2013 | 10/16/2013 | P | PASS |
Troy James
|
|
|
JOB CONTACT IS COLIN Phone #: ###-#### >> Inspection requested via web by ADAM WARR final connection to meter
|
Pressure Test | 10/3/2013 | 10/4/2013 | 10/4/2013 | A | PASS |
Troy James
|
|
|
CONTACT IS COLIN ###-#### Phone #: ###-#### >> Inspection requested via web by LENNIE BUSS ok pressure test to heating pipes
|
Pressure Test | 9/20/2013 | 9/20/2013 | 9/20/2013 | P | PASS |
Troy James
|
|
|
JOB CONTACT - COLIN ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER ok 60# test to gas line, ok test to fluid cooler condenser
|
Pressure Test | 5/23/2013 | 5/24/2013 | 5/28/2013 | P | PART |
Bill VanDegrift
|
|
|
JOB CONTACT - KEITH ###-#### 17TH FLOOR Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER 17th floor loop test ok
|
Rough-in | 5/6/2013 | 5/7/2013 | 5/9/2013 | A | PART |
Bill VanDegrift
|
|
|
contact is Keith ###-#### Phone #: ###-#### >> Inspection requested via web by LENNIE BUSS 16th floor hydronic loop test ok
|
Rough-in | 4/22/2013 | 4/22/2013 | 4/22/2013 | P | PASS |
Troy James
|
|
|
JOB CONTACT IS KEITH Phone #: ###-#### >> Inspection requested via web by ADAM WARR ok hydronics in shaft a 16 to penthouse
|
Rough-in | 4/17/2013 | 4/18/2013 | 4/18/2013 | P | PASS |
Troy James
|
|
|
JOB CONTACT IS KEITH Phone #: ###-#### >> Inspection requested via web by ADAM WARR ok 15th floor hydronics
|
Pressure Test | 4/10/2013 | 4/10/2013 | 4/11/2013 | P | PASS |
Troy James
|
|
|
CONTACT IS KEITH ###-####. INSPECTION IS FOR HYDRONIC PIPING. Phone #: ###-#### >> Inspection requested via web by LENNIE BUSS ok test and piping at 14th floor
|
Rough-in | 4/2/2013 | 4/3/2013 | 4/3/2013 | A | PASS |
Troy James
|
|
|
JOB CONTACT - KEITH 16TH FLOOR Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER ok hydronic 13th floor
|
Pressure Test | 3/25/2013 | 3/26/2013 | 3/26/2013 | A | PASS |
Troy James
|
|
|
Inspection is for 14th-16th floor. contact is Keith ###-#### Phone #: ###-#### >> Inspection requested via web by LENNIE BUSS ok hydronics in shaft for floors 14-16
|
Pressure Test | 3/15/2013 | 3/18/2013 | 3/18/2013 | A | PASS |
Troy James
|
|
|
JOB CONTACT - KEITH ###-#### PARTIAL PRESSURE TEST ON 11TH AND 12TH FLOOR Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER hydronics floors 11 and 12, shaft up to 16th floor and gas piping up to 16th floor
|
Pressure Test | 3/8/2013 | 3/11/2013 | 3/11/2013 | A | PASS |
Troy James
|
|
|
keith ###-#### ok test to hydronic on the 10th and 11th floor.
|
Pressure Test | 3/8/2013 | 3/8/2013 | 3/8/2013 | P | CANC |
Bill VanDegrift
|
|
|
keith ###-#### oops wrong day
|
Pressure Test | 3/7/2013 | 3/8/2013 | 3/8/2013 | A | CANC |
Bill VanDegrift
|
|
|
JOB CONTACT IS KEITH Phone #: ###-#### >> Inspection requested via web by ADAM WARR sent to Troy for manday
|
Pressure Test | 2/26/2013 | 2/26/2013 | 2/26/2013 | P | PASS |
Troy James
|
|
|
contact is colin ###-#### Phone #: ###-#### >> Inspection requested via web by LENNIE BUSS ok hydronic 8th floor and shaft to 14th floor and ok 80# test to gas line in shaft to 14th floor.
|
Rough-in | 2/12/2013 | 2/13/2013 | 2/13/2013 | P | PASS |
Troy James
|
|
|
JOB CONTACT - KEITH ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER ok hydronics to 2, 6, and 7 floor and pipe in shaft to 9th floor
|
Pressure Test | 2/4/2013 | 2/4/2013 | 2/4/2013 | A | PASS |
Troy James
|
|
|
gas and condensation line test in shaft 60 # test to natural gas line from meter base to 9th floor, 150# test to condenser lines to 9th floor in shaft.
|
Pressure Test | 1/23/2013 | 1/24/2013 | 1/25/2013 | P | PASS |
Troy James
|
|
|
CONTACT IS COLIN ###-#### Phone #: ###-#### >> Inspection requested via web by LENNIE BUSS ok risers to the 9th floor and the branches at the 3rd, 4th, and 5th floor
|
Issue PAID IN FULL permit | | | 1/17/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/17/2013 | | DONE |
|
|
|
This permit was created on the web by ADAM WARR
|