Final | 4/5/2013 | 4/12/2013 | 4/12/2013 | P | PASS |
Dixie Fellows
|
|
|
installer sam ###-#### Phone #: ###-#### >> Inspection requested via web by Dustin Rich
|
Pressure Test | 4/10/2013 | 4/11/2013 | 4/11/2013 | A | PASS |
Dixie Fellows
|
|
|
miguel ###-#### installer Phone #: ###-#### >> Inspection requested via web by Dustin Rich...20lb gas ok
|
Pressure Test | 4/10/2013 | 4/10/2013 | 4/10/2013 | P | NH |
Dixie Fellows
|
|
|
miguel ###-#### >> Inspection requested via web by Dustin Rich...left a notice on the door
|
Pressure Test | 4/5/2013 | 4/11/2013 | 4/10/2013 | A | CANC |
Dixie Fellows
|
|
|
installer sam ###-#### Phone #: ###-#### >> Inspection requested via web by Dustin Rich Inspection cancelled from web by: Dustin Rich
|
Issue PAID IN FULL permit | | | 4/5/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/5/2013 | | DONE |
|
|
|
This permit was created on the web by Dustin Rich
|