Final | 6/4/2013 | 6/5/2013 | 6/5/2013 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison final ok
|
Final | 6/3/2013 | 6/3/2013 | 6/3/2013 | P | NR |
Bill VanDegrift
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison they wont be doing a duct blaster because of the existing system but will be back for an air balance and will recall.
|
Rough-in | 4/30/2013 | 5/1/2013 | 5/1/2013 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison no duct blas test verified at this time
|
Final | 4/30/2013 | 5/1/2013 | 4/30/2013 | A | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison Inspection cancelled from web by: Brad Allison
|
Rough-in | 4/28/2013 | 4/30/2013 | 4/30/2013 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brad Allison-need approved manual-j on site for rough-in. 20 lb gas test pass
|
Issue PAID IN FULL permit | | | 4/25/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/25/2013 | | DONE |
|
|
|
This permit was created on the web by Brad Allison
|