First Notice | 11/5/2013 | 11/5/2013 | 5/29/2014 | | DONE |
Eric Strole
|
|
|
|
Final | 11/5/2013 | 11/5/2013 | 11/5/2013 | P | PASS |
Eric Strole
|
|
|
Reinspect final Mechanical Phone #: ###-#### >> Inspection requested via web by Konrad Swartz
|
Conference | 11/5/2013 | 11/5/2013 | 11/5/2013 | A | PEND |
Dixie Fellows
|
|
|
called wade to schedule an inspection for venting on the wh
|
Final | 10/25/2013 | 10/25/2013 | 10/25/2013 | P | PART |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Konrad Swartz...TEMP OCCUPANCY OK
|
Pressure Test | 8/21/2013 | 8/22/2013 | 8/22/2013 | A | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### >> Inspection requested via web by Konrad Swartz 1-60# TEST FROM METER TO EXISTING ON ROOF AND 1-20# TEST FROM REGULATOR TO KITCHEN HEADER
|
Pressure Test | 8/20/2013 | 8/21/2013 | 8/21/2013 | P | FAIL |
Bill VanDegrift
|
|
|
ready after 12:00 Phone #: ###-#### >> Inspection requested via web by Konrad Swartz needs a 100# gage for a 60# test
|
Pressure Test | 8/20/2013 | 8/21/2013 | 8/20/2013 | A | FAIL |
Bill VanDegrift
|
|
|
guage is on the roof...inside test at hoods already done remove the union on the 1" riser to the roof. retest and call for inspection
|
Rough-in | 8/19/2013 | 8/20/2013 | 8/20/2013 | A | PART |
Dixie Fellows
|
|
|
Rough in w/ gas pressure. Please note we are not doing the duct over the kitchen at this time. Phone #: ###-#### >> Inspection requested via web by Konrad Swartz...all spiral duct ok...20lb test for kitchen equipment ok
|
Issue PAID IN FULL permit | | | 8/1/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 8/1/2013 | | |
|
|
|
|
Application received | | | 8/1/2013 | | DONE |
|
|
|
This permit was created on the web by Konrad Swartz
|