Final | 5/8/2014 | 5/9/2014 | 5/9/2014 | P | PASS |
Eric Strole
|
|
|
Ken Phone #: ###-####-20 lb gas test pass
|
Pressure Test | 1/28/2014 | 1/29/2014 | 1/29/2014 | A | PASS |
Dixie Fellows
|
|
|
ken ###-#### ....20lb gas ok
|
Pressure Test | 1/28/2014 | 1/28/2014 | 1/28/2014 | P | PEND |
Dixie Fellows
|
|
|
ken Phone #: ###-####.. i ran out of time so i called ken and rescheduled for wed am
|
Pressure Test | 1/23/2014 | 1/27/2014 | 1/27/2014 | A | FAIL |
Dixie Fellows
|
|
|
water heater venting and rough in pressure test 4 branches. Call Ken Jones with questions Phone #: ###-#### >> Inspection requested via web by Ken Jones...NEED MANUF SPECS FOR W/H AND BTU LOAD ON EQUIPMENT
|
Fees Due Hold | 1/25/2014 | | 1/27/2014 | | DONE |
|
|
|
|
Conference | 8/13/2013 | 8/14/2013 | 8/14/2013 | A | PART |
Bill VanDegrift
|
|
|
radient heat slab >> Inspection requested via web by Ken Jones 100# test ok
|
Rough-in | 8/14/2013 | 8/14/2013 | 8/14/2013 | P | PART |
Bill VanDegrift
|
|
|
radient heat slab >> Inspection requested via web by Ken Jones 100# test ok
|
Issue PAID IN FULL permit | | | 8/13/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/13/2013 | | DONE |
|
|
|
This permit was created on the web by Ken Jones
|