Final | 10/7/2013 | 10/7/2013 | 10/7/2013 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 8/20/2013 | 8/21/2013 | 8/21/2013 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by April Thomas-20 lb gas test and rough-in pass
|
Pressure Test | 8/19/2013 | 8/20/2013 | 8/20/2013 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by April Thomas- GAUGE CAN BE NO MORE THEN A 30 LB GAUGE FOR A 20 LB TEST. CANNOT USE A 100 LB GAUGE.
|
Rough-in | 8/20/2013 | 8/20/2013 | 8/20/2013 | P | CANC |
Eric Strole
|
|
|
As late as possible. Please call before going out. Thanks. Phone #: ###-#### >> Inspection requested via web by April Thomas Inspection cancelled from web by: April Thomas
|
Final | 8/20/2013 | 8/20/2013 | 8/20/2013 | P | CANC |
Eric Strole
|
|
|
As late as possible. Please call before going out. Thanks. Phone #: ###-#### >> Inspection requested via web by April Thomas Inspection cancelled from web by: April Thomas
|
Rough-in | 8/19/2013 | 8/20/2013 | 8/20/2013 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by April Thomas-need approved manual-j on site for rough-in inspection
|
Issue PAID IN FULL permit | | | 8/15/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/15/2013 | | DONE |
|
|
|
This permit was created on the web by April Thomas
|