Final | 10/1/2013 | 10/3/2013 | 10/3/2013 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Randy Hart
|
Final | 10/3/2013 | 10/3/2013 | 10/3/2013 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Randy Hart Inspection cancelled from web by: Randy Hart
|
Final | 9/30/2013 | 10/1/2013 | 10/1/2013 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Randy Hart-need air balance report for final.
|
Rough-in | 8/28/2013 | 8/29/2013 | 8/29/2013 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by Randy Harture pressure test ok, no duct blast test
|
Pressure Test | 8/27/2013 | 8/28/2013 | 8/28/2013 | P | CANC |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by Randy Hart schedule gas inspection same time as rough inspection.
|
Rough-in | 8/27/2013 | 8/28/2013 | 8/28/2013 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Randy Hart Inspection cancelled from web by: Randy Hart
|
Issue PAID IN FULL permit | | | 8/22/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/22/2013 | | DONE |
|
|
|
This permit was created on the web by Randy Hart
|