Pressure Test | 10/30/2013 | 10/31/2013 | 10/31/2013 | A | CANC |
Bill VanDegrift
|
|
|
pt on flue this permit was finaled yesterday
|
Final | 10/29/2013 | 10/30/2013 | 10/30/2013 | P | PASS |
Alan Hauser
|
|
|
early as poss // David Stanfield Phone #: ###-####
|
Fees Due Hold | 10/22/2013 | | 10/29/2013 | | DONE |
Tisha Gallop
|
|
|
|
Rough-in | 10/18/2013 | 10/21/2013 | 10/21/2013 | A | FAIL |
Dixie Fellows
|
|
|
Pressure test also please-David Stanfield--PLease call prior to inspection Phone #: ###-####...this job requires a building permit and a manual J..I posted a stop-work and talked to the G/C
|
Application received | | | 10/15/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/15/2013 | | DONE |
Tisha Gallop
|
|
|
|
(F) Reprint permit | | | 10/15/2013 | | DONE |
|
|
|
|