Rough-in | 1/22/2014 | 1/23/2014 | 1/23/2014 | A | PASS |
Eric Strole
|
|
|
As late in the morning as possible please. Thanks. Phone #: ###-#### >> Inspection requested via web by April Thomas
|
Final | 1/22/2014 | 1/23/2014 | 1/23/2014 | A | PASS |
Eric Strole
|
|
|
As late in the morning as possible please. Thanks. Phone #: ###-#### >> Inspection requested via web by April Thomas
|
Pressure Test | 1/22/2014 | 1/23/2014 | 1/23/2014 | A | PASS |
Eric Strole
|
|
|
As late in the morning as possible please. Thanks. Phone #: ###-#### >> Inspection requested via web by April Thomas-20 lb gas test pass
|
Pressure Test | 1/2/2014 | 1/2/2014 | 1/2/2014 | P | PASS |
Dixie Fellows
|
|
|
Early afternoon if possible. Jon w/Green Remodel, ###-####. Phone #: ###-#### >> Inspection requested via web by April Thomas...20LB GAS OK
|
Issue PAID IN FULL permit | | | 1/2/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/2/2014 | | DONE |
|
|
|
This permit was created on the web by April Thomas
|