Final | 9/23/2014 | 9/24/2014 | 9/24/2014 | A | CANC |
Bill VanDegrift
|
|
|
Erin Richtmeier Phone #: ###-#### canceled by contractor
|
Final | 9/22/2014 | 9/22/2014 | 9/22/2014 | P | FAIL |
Dixie Fellows
|
|
|
Erin Phone #: ###-####..need 1" clearance at b-vent..need drain pan under w/h and must terminate outside..insulate condensate drains in attic..dryer vent outside location
|
Rough-in | 6/19/2014 | 6/20/2014 | 6/20/2014 | A | PASS |
Dixie Fellows
|
|
|
erin Phone #: ###-####..r/i and 20lb gas ok..duct blast ok
|
Conference | 5/28/2014 | 5/29/2014 | 5/29/2014 | A | PASS |
Dixie Fellows
|
|
|
9:00 MEET OWNER...###-####..met with owner to discuss c/n
|
Rough-in | 5/27/2014 | 5/28/2014 | 5/28/2014 | A | FAIL |
Dixie Fellows
|
|
|
10:30 meet dixie..WILL MEET OWNER THURS AT 9:00.
|
Rough-in | 5/27/2014 | 5/28/2014 | 5/28/2014 | A | FAIL |
Eric Strole
|
|
|
10:30 meet dixie-See dixie's notes.
|
Rough-in | 5/27/2014 | 5/27/2014 | 5/27/2014 | P | PEND |
Dixie Fellows
|
|
|
Erin Phone #: ###-####..will have eric meet me at this job
|
Final | 5/23/2014 | 5/27/2014 | 5/27/2014 | A | CANC |
Dixie Fellows
|
|
|
Erin Phone #: ###-####
|
Rough-in | 5/15/2014 | 5/16/2014 | 5/16/2014 | A | FAIL |
Dixie Fellows
|
|
|
Please call ahead for access - Erin Phone #: ###-####..posted corrections on window..will also need to check drains from furnace in attic
|
Rough-in | 3/24/2014 | 3/25/2014 | 3/25/2014 | A | FAIL |
Dixie Fellows
|
|
|
erin Phone #: ###-####..NEED A MANUAL J
|
Conference | 2/27/2014 | 2/27/2014 | 2/27/2014 | P | CANC |
Chad Schwendiman
|
|
|
|
Application received | | | 2/24/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/24/2014 | | DONE |
|
|
|
|