First Notice | 8/7/2014 | 8/7/2014 | 6/9/2017 | | DONE |
Chad Schwendiman
|
|
|
This permit finaled on the web by Michele Atwood
|
Final | 8/6/2014 | 8/7/2014 | 8/7/2014 | A | PASS |
Chad Schwendiman
|
|
|
Younglim (Owner) Phone #: ###-####
|
Final | 5/28/2014 | 5/29/2014 | 5/29/2014 | P | PART |
Chad Schwendiman
|
|
|
richard Phone #: ###-#### - GAVE TEMPORARY. STILL NEED TO INSTALL DUCT HEATER IN MAKE UP AIR.
|
Conference | 5/14/2014 | 5/15/2014 | 5/15/2014 | A | DONE |
Chad Schwendiman
|
|
|
Need you to look at what we have fixed and redone Phone #: ###-#### >> Inspection requested via web by Michele Atwood
|
Rough-in | 5/8/2014 | 5/9/2014 | 5/9/2014 | P | PART |
Chad Schwendiman
|
|
|
R/I and pressure test-Richard Phone #: ###-#### - 1ST LAYOR DUCT WRAP OK. NEED 18" CLEARANCE TO COMBUSTABLE FROM HOOD, TEMPRATURE DIFFERENTIAL BETWEEN MAKE UP AIR IN THE CONDITIONED SPACE SHALL NOT EXCEED 10DEG., MAKE UP AIR NEEDS TO BE INTERLOCKED WITH HOOD, NEED TO PIPE THE DRAIN ON THE SWAP COOLER AWAY FROM ELECTRICAL BOX
|
Application received | | | 5/1/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/1/2014 | | DONE |
|
|
|
|