Final | 5/22/2014 | 5/23/2014 | 5/23/2014 | P | PASS |
Chad Schwendiman
|
|
|
iNSTALLER JAROD (801)-###-####
|
Final | 5/20/2014 | 5/21/2014 | 5/21/2014 | P | FAIL |
Chad Schwendiman
|
|
|
jared Phone #: ###-#### - MAKE UP AIR INLETS NEED TO BE INSTALLED ON EXTERIOR WALLS DOWN LOW CLOSE TO THE FLOOR. ALL EXHAUST OUTLETS NEED TO BE INSTALLED UP HIGH CLOSE TO THE ROOF LINE. PER IMC 2009 502.16.1
|
Pressure Test | 5/6/2014 | 5/7/2014 | 5/7/2014 | A | PASS |
Eric Strole
|
|
|
100 psi test on hydronics pass
|
Pressure Test | 5/5/2014 | 5/6/2014 | 5/6/2014 | A | FAIL |
Chad Schwendiman
|
|
|
Todd Phone #: ###-#### - Need to pressure test to 60LBs
|
Issue PAID IN FULL permit | | | 5/5/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/5/2014 | | DONE |
|
|
|
This permit was created on the web by Steve Marcus
|
First Notice | 5/23/2014 | 5/23/2014 | | | |
Chad Schwendiman
|
|
|
|