Final | 6/20/2014 | 6/24/2014 | 6/24/2014 | A | PASS |
Chad Schwendiman
|
|
|
Wet switch is installed on secondary drain at ac coil Phone #: ###-#### >> Inspection requested via web by John Bertram
|
Final | 6/19/2014 | 6/20/2014 | 6/20/2014 | A | FAIL |
Chad Schwendiman
|
|
|
electric to gas furnace change out with gas pressure test and vent pressure test, ready for final Phone #: ###-#### >> Inspection requested via web by John Bertram - NEED TO RUN SECONDARY CONDENSATE ON COIL, OR INSTALL A WET SWITCH.
|
Pressure Test | 6/20/2014 | 6/20/2014 | 6/20/2014 | A | PASS |
Chad Schwendiman
|
|
|
electric to gas furnace change out with gas pressure test and vent pressure test, ready for final Phone #: ###-#### >> Inspection requested via web by John Bertram - 20LB GAS PRESSURE PASS, 5LB FLUE PRESSURE PASS
|
Issue PAID IN FULL permit | | | 6/17/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/17/2014 | | DONE |
|
|
|
This permit was created on the web by John Bertram
|