Final | 8/1/2014 | 8/1/2014 | 8/1/2014 | P | PASS |
Dixie Fellows
|
|
|
###-####..corrections done..20lb ug ok...there will be a pool heater some time in the future
|
Pressure Test | 7/31/2014 | 8/1/2014 | 8/1/2014 | A | PASS |
Dixie Fellows
|
|
|
Corrections Made, Ready for reinspection Phone #: ###-#### >> Inspection requested via web by sean rocke
|
Pressure Test | 7/30/2014 | 7/31/2014 | 7/31/2014 | A | FAIL |
Troy James
|
|
|
Underground piping on test Phone #: ###-#### >> Inspection requested via web by sean rocke expose gas line for inspections if the gas line is plastic, need 18 gage wire along the gas line. test guage shall not be 2 times larger than the required test pressure.
|
Issue PAID IN FULL permit | | | 7/30/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/30/2014 | | DONE |
|
|
|
This permit was created on the web by sean rocke
|