Final | 5/22/2015 | 5/26/2015 | 5/26/2015 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### >> Inspection requested via web by Nick Drake..bill v. finaled this last friday
|
Pressure Test | 5/21/2015 | 5/22/2015 | 5/22/2015 | A | PASS |
Bill VanDegrift
|
|
|
Shannon-homeowner is requesting final on all subs-she says work is done and needs bldg final as well-please call 30 minutes prior to meet Phone #: ###-####
|
Conference | 10/27/2014 | 10/28/2014 | 10/28/2014 | P | PASS |
Bill VanDegrift
|
|
|
Customer may not be there. Lock box code is 1101 Phone #: ###-#### Inspection requested via web by Amanda Drake 5# flue test ok ok to cover rough in will verify with ACCA report when ready ok to cover lineset in the garage.
|
Conference | 10/27/2014 | 10/27/2014 | 10/27/2014 | P | NH |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Drake called mike will open
|
Conference | 10/21/2014 | 10/22/2014 | 10/22/2014 | P | FAIL |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by Amanda Drake Corrections posted on site front window. rough inspection
|
Issue PAID IN FULL permit | | | 10/21/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/21/2014 | | DONE |
|
|
|
This permit was created on the web by Amanda Drake
|