Print Statement | | | 12/23/2015 | | DONE |
|
|
|
|
Final | 7/31/2015 | 7/31/2015 | 7/31/2015 | P | PASS |
Chad Schwendiman
|
|
|
Final on Mini split, please call Bryan. Thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum
|
Final | 7/30/2015 | 7/31/2015 | 7/31/2015 | A | FAIL |
Chad Schwendiman
|
|
|
Final on Mini split, please call Bryan. Thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - condensate not complete, need to secure unit on roof
|
Final | 7/28/2015 | 7/28/2015 | 7/28/2015 | P | PART |
Chad Schwendiman
|
|
|
Please call Bryan, THANK YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 4th floor and club house okay. Still need to inspect the ductless.
|
Final | 7/21/2015 | 7/21/2015 | 7/21/2015 | P | PART |
Chad Schwendiman
|
|
|
Final to cover on the 1st floor, call Bryan. Thank You! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - okay to cover 1st floor ceilings
|
Final | 7/16/2015 | 7/16/2015 | 7/16/2015 | P | PART |
Chad Schwendiman
|
|
|
Final on level 2 and 3, please call Bryan. Thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 2nd and 3rd floor okay
|
Rough-in | 7/13/2015 | 7/13/2015 | 7/13/2015 | A | PART |
Chad Schwendiman
|
|
|
Smoke dampers in elevator lobbys, Bryan ###-####
|
Rough-in | 7/10/2015 | 7/10/2015 | 7/10/2015 | P | PASS |
Chad Schwendiman
|
|
|
R/I for corridors on all floors, please call Bryan. Thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - okay to cover corridoor ceilings
|
Rough-in | 7/7/2015 | 7/7/2015 | 7/7/2015 | P | FAIL |
Chad Schwendiman
|
|
|
Corridor; contact Bryan Laughridge Phone #: ###-#### Inspection requested via web by Rhonda Marcum - need to remove ceiling tiles around diffusers for inspection, missing diffusers on 3rd and 4th floors, flex duct to diffusers is still smashed.
|
Final | 6/23/2015 | 6/23/2015 | 6/24/2015 | P | FAIL |
Troy James
|
|
|
We need a final for Area 1, Level 2-3 and Area 2, Level 1-2-3. Please call Bryan. Thank you! Phone #: ###-#### >> Inspection requested via web by Rhonda Marcum Need fire smoke dampers at study room adjacent to elevator lobby third and fourth level. Supply to diffusers at corridor is smashed by the sprinkler pipe. Need other approved means to get the required cfm design.
|
Rough-in | 6/16/2015 | 6/16/2015 | 6/16/2015 | P | PART |
Chad Schwendiman
|
|
|
R/I to cover in corridor #1, please call Bryan. Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - okay to cover grid ceilings 2nd floor north and middle corridoors
|
Rough-in | 6/8/2015 | 6/8/2015 | 6/8/2015 | P | PART |
Chad Schwendiman
|
|
|
Please call Bryan, Thank You! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - okay to cover the hard lids and soffits in the club house
|
Rough-in | 6/4/2015 | 6/5/2015 | 6/5/2015 | A | FAIL |
Chad Schwendiman
|
|
|
We need a R/I on the clubhousse. Please call Bryan. Thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - rough in not complete in the club house
|
Rough-in | 5/29/2015 | 5/29/2015 | 5/29/2015 | P | PART |
Chad Schwendiman
|
|
|
R/I for the southwing trash room exhaust, please call Bryan. Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - okay to cover exhaust in trash room south west wing
|
Rough-in | 5/27/2015 | 5/27/2015 | 5/27/2015 | P | PART |
Chad Schwendiman
|
|
|
Ceiling cover for the elevator lobby's Bryan ###-#### - okay to cover ceilings in the elevator lobbys.
|
Rough-in | 5/26/2015 | 5/26/2015 | 5/26/2015 | P | FAIL |
Chad Schwendiman
|
|
|
Please call Bryan, Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - need instalation instructions for the round fire smoke dampers in the elevator lobbys showing the retaining angle methods. Do not cover
|
Rough-in | 5/21/2015 | 5/22/2015 | 5/22/2015 | A | PART |
Chad Schwendiman
|
|
|
R/I for 4th floor, please call Bryan. Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 4th floor south area okay to cover soffits and hard lids
|
Rough-in | 5/19/2015 | 5/20/2015 | 5/20/2015 | A | PART |
Chad Schwendiman
|
|
|
We need R/I for 4th floor, please call Bryan. Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 4th floor middle are okay to cover soffits and hard lids
|
Rough-in | 5/14/2015 | 5/14/2015 | 5/14/2015 | P | PART |
Chad Schwendiman
|
|
|
Please call Bryan, R/I for 4th floor. Thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 4th floor north area okay to cover soffits and hard lids
|
Rough-in | 5/7/2015 | 5/8/2015 | 5/8/2015 | A | PART |
Chad Schwendiman
|
|
|
Please call Bryan. Thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 3rd floor south wing okay to cover soffits and hard lids
|
Rough-in | 5/5/2015 | 5/5/2015 | 5/5/2015 | P | PART |
Chad Schwendiman
|
|
|
Please call Bryan. Thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 2nd floor south wing okayy to cover soffits and hard lids
|
Rough-in | 5/1/2015 | 5/1/2015 | 5/1/2015 | P | PART |
Chad Schwendiman
|
|
|
R/I on the clubhouse, please call Bryan. Thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - okay to cover bottom of trusses in the club house area.
|
Rough-in | 4/24/2015 | 4/24/2015 | 4/24/2015 | P | PART |
Chad Schwendiman
|
|
|
R/I 3rd floor middle wing, please call Bryan. Thank You! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - okay to cover soffits and hard lids on 3rd floor area 2.
|
Rough-in | 4/16/2015 | 4/16/2015 | 4/16/2015 | P | PART |
Chad Schwendiman
|
|
|
Call Bryan, level 2, and level 4 inside corner units. Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - okay to cover the soffits in area 2 2nd floor
|
Rough-in | 4/3/2015 | 4/3/2015 | 4/3/2015 | P | PART |
Chad Schwendiman
|
|
|
Inspection on Area 1 Level 3, please call Bryan. Thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - okay to cover soffits 3rd floor area 1
|
Rough-in | 3/20/2015 | 3/20/2015 | 3/20/2015 | P | PART |
Chad Schwendiman
|
|
|
Area 1, Level 2. Call Bryan with any questions. Thank You! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - okay to cover soffits in rooms 229 through 241
|
Rough-in | 3/10/2015 | 3/10/2015 | 3/10/2015 | A | PART |
Chad Schwendiman
|
|
|
fire damp corridor, ok to cover - Brian Phone #: ###-#### - okay to cover bottom of tgi's and walls in all dwelling units except for the interior corner units.
|
Rough-in | 2/20/2015 | 2/23/2015 | 2/23/2015 | A | PART |
Chad Schwendiman
|
|
|
Rough In with ok to cover walls. Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 2nd. through 4th floors okay to cover walls except for south wing, and interior corner units.
|
Rough-in | 2/4/2015 | 2/4/2015 | 2/4/2015 | P | PART |
Chad Schwendiman
|
|
|
Please call Bryan with any questions. Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - Okay to cover bottom of tgi's in the units on 2nd. through 4th. floors except for the interior corner units, and the south wings of the 3rd. and 4th. floors
|
Conference | 1/12/2015 | 1/12/2015 | 1/12/2015 | P | DONE |
Chad Schwendiman
|
|
|
Please call Bryan and he will meet you. Thank YOU! Phone #: ###-#### Inspection requested via web by Rhonda - The exhaust has been flexed on all of the 2nd floor, and the north and middle wing of the 3rd floor. these runs will need 10' of metal duct from the pvc to the flex. all other units will need to be hard piped the whole way out.
|
Rough-in | 1/6/2015 | 1/7/2015 | 1/7/2015 | A | PART |
Chad Schwendiman
|
|
|
Call Bryan with questions 1st floor lobby please and thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - 1st floor lobby rough in pass. The dryer duct in the 2 & 3 bedroom units exceed the manufactures allowable length.
|
Conference | 12/19/2014 | 12/19/2014 | 12/19/2014 | A | DONE |
Chad Schwendiman
|
|
|
Meet troy at 9:00
|
Conference | 12/19/2014 | 12/19/2014 | 12/19/2014 | A | DONE |
Troy James
|
|
|
unable to come up with a way to properly connect pvc pipe to galvanized pipe. Engineer to come up with another approved design.
|
Conference | 11/17/2014 | 11/18/2014 | 11/18/2014 | P | DONE |
Chad Schwendiman
|
|
|
met with dave hanna & Bryan from ymc to discuss penetrations in fire assemblies
|
Conference | 11/14/2014 | 11/17/2014 | 11/17/2014 | A | DONE |
Chad Schwendiman
|
|
|
Please call Bryan Laughridge and he will meet. Thank You! Phone #: ###-#### Inspection requested via web by Rhonda Marcum
|
Issue PAID IN FULL permit | | | 11/14/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/14/2014 | | DONE |
|
|
|
This permit was created on the web by Rhonda Marcum
|