Final | 3/13/2015 | 3/13/2015 | 3/13/2015 | A | PASS |
Chad Schwendiman
|
|
|
|
Conference | 3/13/2015 | 3/13/2015 | 3/13/2015 | A | DONE |
Chad Schwendiman
|
|
|
Sensors are in and functioning Phone #: ###-#### Inspection requested via web by Drew Tverdy - this was a final
|
Final | 3/11/2015 | 3/11/2015 | 3/11/2015 | P | FAIL |
Chad Schwendiman
|
|
|
Hood Final. Call me before hand so I can meet there. Phone #: ###-#### Inspection requested via web by Drew Tverdy - Type 1 hood needs to either be interlocked with the equipment or have a heat sensor to activate it.
|
Final | 3/4/2015 | 3/6/2015 | 3/4/2015 | A | CANC |
Chad Schwendiman
|
|
|
I will try and be there but if I am not I will have the balance report for the two ventilation systems in the Class 1 control panel. Thanks, Drew Phone #: ###-#### >> Inspection requested via web by Drake Strickler Inspection cancelled from web by: Drew Tverdy
|
Rough-in | 2/17/2015 | 2/18/2015 | 2/18/2015 | A | PART |
Bill VanDegrift
|
|
|
Jesse Phone #: ###-#### 1st layer of fire wrap ok on 6' of duct sitting on the floor
|
Rough-in | 2/13/2015 | 2/17/2015 | 2/17/2015 | A | PART |
Chad Schwendiman
|
|
|
Exhaust duct light test. Please call prior to arrival Phone #: ###-#### Inspection requested via web by Drake Strickler - light test pass on grease duct
|
Issue PAID IN FULL permit | | | 2/13/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 2/13/2015 | | DONE |
|
|
|
This permit was created on the web by Drake Strickler
|
First Notice | 3/13/2015 | 3/13/2015 | | | |
Chad Schwendiman
|
|
|
|