Final | 10/19/2015 | 10/20/2015 | 10/20/2015 | P | PASS |
Dixie Fellows
|
|
|
please do a final inspection. call eric to meet onsite ###-#### Phone #: ###-#### >> Inspection requested via web by Alana Lane..ductwork on 2nd floor ok..job finaled
|
Final | 10/12/2015 | 10/15/2015 | 10/15/2015 | P | PASS |
Dixie Fellows
|
|
|
John Phone #: ###-####
|
Pressure Test | 4/15/2015 | 4/16/2015 | 4/16/2015 | P | PASS |
Dixie Fellows
|
|
|
Someone will be on-site or there is a lock box code for entry = 3993 Phone #: ###-#### >> Inspection requested via web by Angie Maguire
|
Rough-in | 4/15/2015 | 4/16/2015 | 4/16/2015 | P | PASS |
Dixie Fellows
|
|
|
Someone will be on-site or there is a lock box code for entry = 3993 Phone #: ###-#### >> Inspection requested via web by Angie Maguire
|
Issue PAID IN FULL permit | | | 4/15/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/15/2015 | | DONE |
|
|
|
This permit was created on the web by Angie Maguire
|