Information based on query as of Monday, July 22, 2024.
Permit Information
Permit NumberMEC15-01781
StatusFinaled
Name FRANKLIN BUILDING SUPPLY
Site Address 526 E ORION CT
Project Name 
Customer Number 
ePlanReviewNo
Description
Mechanical Permit - New: Install Gas Fireplace
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final1/23/20201/23/20201/23/2020PPASS
DetailsBen Livingston
Mechanical Gas Fireplace Final Inspection 2 units on main floor. One in Living room and one in bedroom.The basement unit NOT installed. Phone #: ###-#### Inspection requested via web by Dan Otero
Mec-Aging Inspection12/11/201912/11/201912/11/2019 CANC
DetailsBen Livingston
Mec-Aging Inspection9/11/20199/11/20199/11/2019 CANC
DetailsBen Livingston
Mec-Aging Inspection6/12/20196/12/20196/12/2019 CANC
DetailsBen Livingston
Mec-Aging Inspection3/13/20193/13/20193/13/2019 CANC
DetailsBen Livingston
Mec-Aging Inspection12/12/201812/12/201812/12/2018 CANC
DetailsBen Livingston
Mec-Aging Inspection9/12/20189/12/20189/12/2018 CANC
DetailsBen Livingston
Mec-Aging Inspection6/13/20186/13/20186/13/2018 CANC
DetailsBen Livingston
Mec-Aging Inspection3/14/20183/14/20183/14/2018 CANC
DetailsBen Livingston
Mec-Aging Inspection12/13/201712/13/201712/13/2017 PEND
DetailsBen Livingston
Mec-Aging Inspection9/13/20179/13/20179/13/2017 PEND
DetailsBen Livingston
Mec-Aging Inspection6/14/20176/14/20176/14/2017 PEND
DetailsBen Livingston
Mec-Aging Inspection3/15/20173/15/20173/15/2017 PEND
DetailsBen Livingston
Mec-Aging Inspection12/14/201612/14/201612/14/2016 PEND
DetailsBen Livingston
Mec-Aging Inspection9/14/20169/14/20169/14/2016 PEND
DetailsBen Livingston
Mec-Aging Inspection6/15/20166/15/20166/15/2016 PEND
DetailsBen Livingston
bld still issued
Mec-Aging Inspection3/16/20163/16/20163/16/2016 PEND
DetailsBen Livingston
Rough-in12/16/201512/16/201512/16/2015PNR
DetailsChad Schwendiman
Phone #: ###-#### Inspection requested via web by Dan Otero - I collected a letter from the fireplace manufacture stating that the fireplace is approved with using flexible duct for the combustion air. Not ready for rough in inspection framing not complete around the fireplaces.
Conference11/23/201511/23/201511/23/2015PDONE
DetailsEric Strole
1:00 PM-See chads notes
Conference11/23/201511/23/201511/23/2015PFAIL
DetailsChad Schwendiman
1:00 PM - the combustion air ducts for the gas fireplaces are currently ran in flex duct. G2407.11 of the IRC states that combustion air ducts need to be ridged metal ducts. we need a letter from a engineer for the firplace manufacture stating the flex duct is acceptable. Need to reschedule rough in inspection when ready
Rough-in11/18/201511/19/201511/19/2015AFAIL
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by Dan Otero-neen to finish framing in all fireplaces.
Issue PAID IN FULL permit  4/27/2015 DONE
Payment received via Govolutions
Application received  4/27/2015 DONE
This permit was created on the web by Dan Otero