Final | 9/30/2015 | 9/30/2015 | 9/30/2015 | P | PASS |
Eric Strole
|
|
|
|
Final | 9/29/2015 | 9/30/2015 | 9/30/2015 | A | CANC |
Eric Strole
|
|
|
Please call Mike when on way to get access into the home. ###-####. The air balance report is on the furnace. Phone #: ###-#### Inspection requested via web by Cassandra Koch-Changed to afternoon.
|
Final | 9/24/2015 | 9/25/2015 | 9/25/2015 | P | FAIL |
Chad Schwendiman
|
|
|
Do need to dial 208 for this phone number. This property is vacant however Mike is going to be there on this day between 1-3pm. If the inspector can call and give a 30 min lead time when headed over there. Phone #: ###-#### Inspection requested via web by Cassandra Koch - No air balance report on site
|
Rough-in | 5/27/2015 | 5/28/2015 | 5/28/2015 | A | PASS |
Alan Hauser
|
|
|
60# and 5# on flue ok
|
Rough-in | 5/26/2015 | 5/27/2015 | 5/27/2015 | P | CANC |
Dixie Fellows
|
|
|
Please call the office when on way out to the jobsite. Phone #: ###-#### >> Inspection requested via web by Cassandra Koch Inspection cancelled from web by: Cassandra Koch
|
Rough-in | 5/19/2015 | 5/20/2015 | 5/20/2015 | A | NR |
Dixie Fellows
|
|
|
Requesting rough in and going to do duct blasting at this same time 11am. Please call the office when in route to job site. ###-#### >> Inspection requested via web by Amanda Emly..need new manual J
|
Conference | 5/19/2015 | 5/19/2015 | 5/19/2015 | P | CANC |
Dixie Fellows
|
|
|
We are going to be doing some duct blasting today at 1pm at this location. Please call the office when in route. Phone #: ###-#### >> Inspection requested via web by Amanda Emly Inspection cancelled from web by: Amanda Emly
|
Issue PAID IN FULL permit | | | 5/13/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/13/2015 | | DONE |
|
|
|
This permit was created on the web by Amanda Emly
|