Final | 1/18/2016 | 1/19/2016 | 1/19/2016 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves
|
Pressure Test | 11/4/2015 | 11/5/2015 | 11/5/2015 | A | PASS |
Eric Strole
|
|
|
|
Rough-in | 11/4/2015 | 11/4/2015 | 11/4/2015 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves
|
Fees Due Hold | 11/4/2015 | | 11/4/2015 | | DONE |
|
|
|
|
Pressure Test | 11/2/2015 | 11/3/2015 | 11/3/2015 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves-Gas test fail.
|
Rough-in | 11/2/2015 | 11/3/2015 | 11/3/2015 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves-Duct sizing is not per the manual-j. Need to insulate line-set in garage overhead. (Reinspection fee issued)
|
Final | 11/2/2015 | 11/3/2015 | 11/2/2015 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Gary Reeves Inspection cancelled from web by: Gary Reeves
|
Issue PAID IN FULL permit | | | 10/22/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/22/2015 | | DONE |
|
|
|
This permit was created on the web by Gary Reeves
|