Print Statement | | | 10/18/2016 | | DONE |
|
|
|
|
Final | 8/11/2016 | 8/11/2016 | 8/11/2016 | P | PASS |
Troy James
|
|
|
Oleg Phone #: ###-####
|
Final | 8/3/2016 | 8/3/2016 | 8/3/2016 | P | FAIL |
Troy James
|
|
|
Oleg Phone #: ###-#### correction notice posted front window
|
Rough-in | 5/24/2016 | 5/25/2016 | 5/25/2016 | P | PASS |
Troy James
|
|
|
Oleg Phone #: ###-####
|
Rough-in | 5/17/2016 | 5/17/2016 | 5/19/2016 | P | FAIL |
Bill VanDegrift
|
|
|
would like call ahead; Oleg Phone #: ###-#### met with OLeg and Chad to go over damper installation. install radiant dampers in accordance with the installation instructions, provide installation instructions for the curtain dampers and install accordingly.
|
Conference | 4/19/2016 | 4/20/2016 | 4/21/2016 | P | PART |
Bill VanDegrift
|
|
|
meet at 1:30 with engineer needs the correct dampers and installation instruction, move bath fans west side. repipe outside air.
|
Conference | 4/19/2016 | 4/20/2016 | 4/20/2016 | P | DONE |
Troy James
|
|
|
meet engineer at 1:30 met with contractor, owner and engineer resulotions to solve fire damper installation and have plans resubmitted.
|
Conference | 4/20/2016 | 4/20/2016 | 4/20/2016 | P | PASS |
Alan Hauser
|
|
|
|
Conference | 4/19/2016 | 4/19/2016 | 4/19/2016 | P | PART |
Bill VanDegrift
|
|
|
met with Oleg about the system installed not being in accordance with approved pland and the issues with penetration protection.
|
Rough-in | 4/14/2016 | 4/15/2016 | 4/15/2016 | A | NR |
Alan Hauser
|
|
|
talked to contractor, he is going to get together with manufactures rep. and go over what is needed and hou to install fire dampers
|
Conference | 4/7/2016 | 4/7/2016 | 4/7/2016 | P | FAIL |
Bill VanDegrift
|
|
|
check dampers and ducting Mike Jordan called questioning assembly penetration protection of the ductwork.I left a correction notice. --Mechanical system is not installed according to approved plans. Install according to approved plans or resubmit plans showing this design and address rated assembly penetrations.-- called general contractor, he thought dampers were showing up next week.
|
Meeting | | | 4/7/2016 | | DONE |
|
|
|
as per Bill V attach to BLD15-01921
|
Rough-in | 2/8/2016 | 2/8/2016 | 2/8/2016 | P | FAIL |
Alan Hauser
|
|
|
install all fire dampers as per approved plans.. Contact Kartchner Engineering for placement and install as per manufacture
|
Rough-in | 12/28/2015 | 12/29/2015 | 12/29/2015 | P | PASS |
Alan Hauser
|
|
|
|
Pressure Test | 12/28/2015 | 12/28/2015 | 12/28/2015 | P | PASS |
Alan Hauser
|
|
|
60#
|
Card not on site to sign | 12/22/2015 | 12/23/2015 | 12/23/2015 | A | FAIL |
Alan Hauser
|
|
|
pressure has dropped
|
Pressure Test | 12/23/2015 | 12/23/2015 | 12/23/2015 | P | FAIL |
Alan Hauser
|
|
|
pressure has dropped
|
Rough-in | 12/23/2015 | 12/23/2015 | 12/23/2015 | P | PART |
Alan Hauser
|
|
|
duct ok and sealed ok to wrap
|
Rough-in | 12/22/2015 | 12/23/2015 | 12/23/2015 | A | PART |
Alan Hauser
|
|
|
duct ok and sealed ok to wrap
|
Issue PAID IN FULL permit | | | 12/18/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/18/2015 | | DONE |
|
|
|
This permit was created on the web by Oleg Chervak
|
First Notice | 8/11/2016 | 8/11/2016 | | | |
Troy James
|
|
|
|