Conference | 4/7/2016 | 4/11/2016 | 4/11/2016 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Sheldon Lebow
|
Final | 4/11/2016 | 4/11/2016 | 4/11/2016 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Sheldon Lebow
|
Rough-in | 12/23/2015 | 12/23/2015 | 12/23/2015 | P | PASS |
Chad Schwendiman
|
|
|
Sealed between OSB ; Firestop as well as Between Pipe ; Firestop on upstairs fireplace.
Secured downstairs fireplace, ran screws through platform into the bottom of the fireplace. Phone #: ###-#### Inspection requested via web by Sheldon Lebow
|
Rough-in | 12/18/2015 | 12/21/2015 | 12/21/2015 | A | FAIL |
Troy James
|
|
|
2 Gas Fireplaces Phone #: ###-#### Inspection requested via web by Sheldon Lebow- secure fireplace on first floor, 2nd floor draft stop needs to be sealed up.
|
Issue PAID IN FULL permit | | | 12/18/2015 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/18/2015 | | DONE |
|
|
|
This permit was created on the web by Sheldon Lebow
|