Final | 2/10/2016 | 2/10/2016 | 2/10/2016 | P | PASS |
Chad Schwendiman
|
|
|
Zach Phone #: ###-####
|
Final | 2/10/2016 | 2/10/2016 | 2/10/2016 | P | PASS |
Chad Schwendiman
|
|
|
chris Phone #: ###-####
|
Final | 2/5/2016 | 2/8/2016 | 2/8/2016 | A | FAIL |
Chad Schwendiman
|
|
|
Zach Phone #: ###-#### - need air balance report for class 1 hood, need hinge kit, and grease reservoir on exhaust fan for class 1 hood
|
Pressure Test | 2/5/2016 | 2/8/2016 | 2/8/2016 | A | PASS |
Chad Schwendiman
|
|
|
Zach Phone #: ###-#### - 20lb gas pass
|
Final | 2/4/2016 | 2/4/2016 | 2/4/2016 | P | CANC |
Chad Schwendiman
|
|
|
Zach Phone #: ###-#### - this was a rough in inspection
|
Rough-in | 2/4/2016 | 2/4/2016 | 2/4/2016 | P | PASS |
Chad Schwendiman
|
|
|
Zach Phone #: ###-#### - 2nd layer firewrap pass
|
Rough-in | 2/2/2016 | 2/2/2016 | 2/2/2016 | P | PASS |
Chad Schwendiman
|
|
|
Zach Phone #: ###-#### - 1st layer of fire wrap okay
|
Rough-in | 1/19/2016 | 1/19/2016 | 1/19/2016 | P | PART |
Chad Schwendiman
|
|
|
Zack Phone #: ###-#### - Grease duct light test pass
|
Conference | 1/5/2016 | 1/5/2016 | 1/5/2016 | A | DONE |
Chad Schwendiman
|
|
|
Phone ###-#### - meet onsite to discuss the termination on the roof for the grease fan, also noticed that the Hood onsite doesn't match the one on the plans. I stated that I need a drawing from the engineer showing the duct configuration and sizes for the hood onsite.
|
Application received | | | 12/30/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/30/2015 | | DONE |
|
|
|
|
First Notice | 2/10/2016 | 2/10/2016 | | | |
Chad Schwendiman
|
|
|
|
First Notice | 2/10/2016 | 2/10/2016 | | | |
Chad Schwendiman
|
|
|
|