Final | 6/21/2016 | 6/22/2016 | 6/22/2016 | A | PASS |
Chad Schwendiman
|
|
|
Inspection requested via web by Konrad Swartz
|
Final | 6/20/2016 | 6/21/2016 | 6/21/2016 | A | FAIL |
Eric Strole
|
|
|
Inspection requested via web by Konrad Swartz-Combustion air needs to be with-in 12" of the top not the bottom. Need to protect line-set with uv protection at a/c.
|
Rough-in | 4/5/2016 | 4/6/2016 | 4/6/2016 | P | PASS |
Ben Livingston
|
|
|
Inspection requested via web by Konrad Swartz
|
Pressure Test | 4/5/2016 | 4/6/2016 | 4/6/2016 | P | PASS |
Ben Livingston
|
|
|
Inspection requested via web by Konrad Swartz -5lb flue 20lb gas
|
Issue PAID IN FULL permit | | | 3/28/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/28/2016 | | DONE |
|
|
|
This permit was created on the web by Konrad Swartz
|