First Notice | 2/24/2017 | 2/24/2017 | 7/13/2017 | | DONE |
Chad Schwendiman
|
|
|
This permit finaled on the web by Dan Flaherty
|
Final | 2/24/2017 | 2/24/2017 | 2/24/2017 | P | PASS |
Chad Schwendiman
|
|
|
please call number above with questions Phone #: ###-#### Inspection requested via web by Marisa Hone
|
Mec-Aging Inspection | 2/2/2017 | 2/2/2017 | 2/2/2017 | | CANC |
Chad Schwendiman
|
|
|
wip
|
Rough-in | 10/19/2016 | 10/20/2016 | 10/20/2016 | P | PASS |
Chad Schwendiman
|
|
|
Rough In for cover. RJ is on site. Phone #: ###-#### Inspection requested via web by Dan Flaherty - okay to cover shaft
|
Rough-in | 10/17/2016 | 10/18/2016 | 10/18/2016 | A | PART |
Chad Schwendiman
|
|
|
RI on the Fire Dampers before sheetrock. Contact is RJ on site. Phone #: ###-#### Inspection requested via web by Dan Flaherty - fire damper installation pass. Need to patch sheetrock in on exposed framing members, and complete duct work in the shaft.
|
Conference | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | DONE |
Chad Schwendiman
|
|
|
Clear-Span has requested an AM Conference with Structural to discuss Fire Dampers/ Shaft. Time to be determined. Phone #: ###-#### Inspection requested via web by Dan Flaherty - discussed the framing for fire dampers in the mechanical chase. They are going to remove the duct and dampers to allow for the framers to frame around the damper openings then reinstall and schedule for inspection. Okay to cover cover walls and ceilings with the exception of the mechanical shaft.
|
Rough-in | 9/30/2016 | 10/4/2016 | 10/4/2016 | A | FAIL |
Chad Schwendiman
|
|
|
Contact-RJ-Please call 30 minutes ahead for our installer to meet you there. Thank you Phone #: ###-#### Inspection requested via web by Crystal - need installation instructions for fire dampers on site, fire dampers need to be installed per manufactures installation instructions.
|
Conference | 7/12/2016 | 7/13/2016 | 7/13/2016 | P | PART |
Chad Schwendiman
|
|
|
Joe-###-####/duct seal inspection Phone #: ###-#### Inspection requested via web by Crystal Grant - okay to insulate the supply duct on the 2 story
|
Issue PAID IN FULL permit | | | 7/12/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/12/2016 | | DONE |
|
|
|
This permit was created on the web by Crystal Grant
|