Final | 8/5/2016 | 8/8/2016 | 8/8/2016 | A | PASS |
Alan Hauser
|
|
|
|
Pressure Test | 8/5/2016 | 8/5/2016 | 8/5/2016 | A | FAIL |
Brian Scoles
|
|
|
Pressure test and final Phone #: ###-#### Inspection requested via web by Ray Bolinger - 20lb gas pass
|
Final | 8/5/2016 | 8/5/2016 | 8/5/2016 | P | FAIL |
Brian Scoles
|
|
|
Pressure test and final Phone #: ###-#### Inspection requested via web by Ray Bolinger - need UV tape on line set outdoor- need weather tight pig tail to A/C to disconnect- need wet switch for secondary drain
|
Pressure Test | 8/5/2016 | 8/5/2016 | 8/5/2016 | P | PASS |
Brian Scoles
|
|
|
Pressure test and final Phone #: ###-#### Inspection requested via web by Ray Bolinger - 20lb gas pass
|
Issue PAID IN FULL permit | | | 8/5/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/5/2016 | | DONE |
|
|
|
This permit was created on the web by Ray Bolinger
|