Final | 11/1/2016 | 11/2/2016 | 11/2/2016 | A | PASS |
Brian Scoles
|
|
|
Paul Phone #: ###-####
|
Pressure Test | 11/1/2016 | 11/2/2016 | 11/2/2016 | A | PASS |
Brian Scoles
|
|
|
Paul Phone #: ###-####- 20lb gas pass- 5lb flue pass
|
Review - MECHANICAL | 10/20/2016 | 10/20/2016 | 10/20/2016 | | DONE |
Chad Schwendiman
|
|
|
Unable to verify building components.
A/C is undersized
|
Miscellaneous action | | | 10/19/2016 | | DONE |
|
|
|
Paul brought in Manuels-took to Troy James
|
Final | 9/15/2016 | 9/16/2016 | 9/16/2016 | A | FAIL |
Brian Scoles
|
|
|
Paul Phone #: ###-####- owner will need to call Troy about getting an ACCA report for this house- Added all new duct work in crawl space, furnace, coil, A/C and return- will need rough in inspection when all is taken care of- permit will need these extra fixtures to permit?
|
Pressure Test | 9/16/2016 | 9/16/2016 | 9/16/2016 | P | PASS |
Brian Scoles
|
|
|
Paul Phone #: ###-####- 20lb gas pass
|
Conference | 9/2/2016 | 9/6/2016 | 9/6/2016 | A | PASS |
Alan Hauser
|
|
|
would like call ahead to meet; Paul Phone #: ###-#### went over gas pipe sizing. 1" to furnace and water heater then split to furn. and w/h 1/2"
|
Application received | | | 9/1/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/1/2016 | | DONE |
|
|
|
|