Final | 12/15/2016 | 12/15/2016 | 12/15/2016 | P | PASS |
Chad Schwendiman
|
|
|
Can you call me before heading over? My cell number is ###-#### Phone #: ###-#### Inspection requested via web by Nat Golden
|
Pressure Test | 10/14/2016 | 10/14/2016 | 10/14/2016 | P | PASS |
Chad Schwendiman
|
|
|
Jake Phone #: ###-#### - 20lb gas, 5lb flue
|
Rough-in | 10/13/2016 | 10/13/2016 | 10/13/2016 | A | PASS |
Chad Schwendiman
|
|
|
Nat Phone #: ###-#### - 20lb gas pass to fireplace, no equipment set at this time. will check at final.
|
Conference | 10/13/2016 | 10/13/2016 | 10/13/2016 | A | CANC |
Chad Schwendiman
|
|
|
Can you call in advanced. I am going to pick up the approved report, first thing in the morning. But, if there is any drama with getting the copy, I assume there is no sense in coming? Phone #: ###-#### >> Inspection requested via web by Nat Golden
|
Rough-in | 10/3/2016 | 10/3/2016 | 10/3/2016 | P | NR |
Brian Scoles
|
|
|
We are not ready to do a final rough in. The supplies in the crawl are not setup, and there is stuff to be done in the basement. However, since I am going out of town, I am hoping that they can cover and insulate the first floor.
The Return has been run, the bath fans have been connected, and the fireplace will be setup.... Will this fly, until I return? Phone #: ###-#### Inspection requested via web by Nat Golden
|
Conference | 9/30/2016 | 9/30/2016 | 9/30/2016 | P | PASS |
Brian Scoles
|
|
|
would like call ahead; Net Phone #: ###-####- talk about bringing combustion air to basement- exhaust and intake to furnace- exhaust to water heater- fireplace rough in
|
Issue PAID IN FULL permit | | | 9/26/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/26/2016 | | DONE |
|
|
|
This permit was created on the web by Nat Golden
|