Final | 10/31/2017 | 10/31/2017 | 10/31/2017 | A | PASS |
Brian Scoles
|
|
|
|
Final | 10/27/2017 | 10/30/2017 | 10/30/2017 | A | CANC |
Brian Scoles
|
|
|
James ###-####- install not complete per homeowner text
|
Final | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | CANC |
Brian Scoles
|
|
|
James Phone #: ###-####- reschedule for Monday
|
Mec-Aging Inspection | 10/26/2017 | 10/26/2017 | 10/26/2017 | | PEND |
Brian Scoles
|
|
|
will call in final soon
|
Pressure Test | 7/25/2017 | 7/25/2017 | 7/25/2017 | P | PASS |
Brian Scoles
|
|
|
James Phone #: ###-####- 20lb gas pass
|
Rough-in | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | FAIL |
Brian Scoles
|
|
|
James Phone #: ###-####- need 30lb max guage for 20lb test- need approved fittings on gas line at fireplace- cant use appliance connector thru fireplace need to be hard piped- need inert tape on gas line where penetrate into building from gas meter- went over with James about issues onsite
|
Issue PAID IN FULL permit | | | 1/18/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Telephone call | | | 1/18/2017 | | DONE |
|
|
|
called James-he is doing the work and will pay today online
|
Application received | | | 11/21/2016 | | DONE |
|
|
|
This permit was created on the web by james mair
|