Final | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | PASS |
Chad Schwendiman
|
|
|
|
Final | 3/7/2018 | 3/7/2018 | 3/7/2018 | A | CANC |
Chad Schwendiman
|
|
|
Final inspections for 710 610 510 410 310. Please contact Rob with any questions or concerns ###-#### Inspection requested via web by Heather Gransbery
|
Final | 3/6/2018 | 3/6/2018 | 3/6/2018 | P | CANC |
Chad Schwendiman
|
|
|
Final inspections for 710 610 510 410 310. Please contact Rob with any questions or concerns. Inspection requested via web by Heather Gransbery
|
Final | 3/5/2018 | 3/5/2018 | 3/5/2018 | P | FAIL |
Chad Schwendiman
|
|
|
Final inspections for 710 610 510 410 310. Please contact Rob with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - Anderson construction need to submit final LEED's commisioning report to boise city before we can final permit out.
|
Final | 3/2/2018 | 3/2/2018 | 3/2/2018 | P | FAIL |
Chad Schwendiman
|
|
|
Final inspection for 710,610,510,410,310. Please contact Rob ###-#### with any questions or concerns. Phone #: ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery - air balancing not complete
|
Final | 3/1/2018 | 3/2/2018 | 3/2/2018 | A | FAIL |
Chad Schwendiman
|
|
|
Final inspection requested for 710 610 510 410 310 Please contact Rob ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Jess Wigley - air balance needs to be completed.
|
Final | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | CANC |
Chad Schwendiman
|
|
|
Final inspection for 710 610 510 410 310. Previously request for 02/08 AM. Please contact Rob ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery
|
Final | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | CANC |
Chad Schwendiman
|
|
|
Request for final inspection Live Works. Please contact Rob ###-#### with any question or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - This is the wrong permit number. comments entered under correct permit number
|
Final | 2/15/2018 | 2/16/2018 | 2/16/2018 | A | PART |
Chad Schwendiman
|
|
|
Request for inspector to sign off on card for occupancy for levels 3;4. Had final and passed, but need inspector signature. Phone #: ###-#### Inspection requested via web by Heather Gransbery - Signed the card
|
Final | 2/9/2018 | 2/9/2018 | 2/9/2018 | P | PART |
Chad Schwendiman
|
|
|
3rd & 4th floors - Temporary occupancy okay for 3rd, and 4th floors
|
Final | 2/9/2018 | 2/12/2018 | 2/9/2018 | A | CANC |
Chad Schwendiman
|
|
|
Request for 3rd floor final inspection. Please contact Rob ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery
|
Final | 2/8/2018 | 2/8/2018 | 2/8/2018 | A | PEND |
Chad Schwendiman
|
|
|
Final inspection request for 710,610,510,410,310. Please contact Rob ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - Need a updated air balance report
|
Final | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PART |
Chad Schwendiman
|
|
|
Request for final Floors 5,6,7. Please contact Rob with any questions or concerns ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery - temporary occupancy okay for 5th, 6th, and 7th floors.
|
Final | 1/25/2018 | 1/26/2018 | 1/26/2018 | A | FAIL |
Chad Schwendiman
|
|
|
Request for Final/TCO on Fl 1, 2, 5, 6, 7. Please contact Rob with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - Need a copy of the air balance report for all area's being occupied. Need approved TCO plan from building official. Need to extend fresh air opening on roof.
|
Final | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | PART |
Chad Schwendiman
|
|
|
Request for Final inspection on 3rd floor. No inspection on RM 310 and 321. Please contact Rob with any questions or concerns. ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery - 3rd floor units okay except for 310, 321, unjt 401, 501, 520, 534, (This activity was added in error so we have changed the case status back to Issued.)
|
CHANGE STATUS TO (ISS) | | | 1/17/2018 | | DONE |
|
|
|
per Chad S. finaled by mistake. Final insp was a PART
|
Final | 1/15/2018 | 1/16/2018 | 1/16/2018 | A | CANC |
Chad Schwendiman
|
|
|
Request for Final inspection on 3rd Floor. No inspection on Rm 310 and 321. Please contact Rob ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery
|
Final | 1/12/2018 | 1/12/2018 | 1/12/2018 | A | PART |
Chad Schwendiman
|
|
|
Request for final inspection on 4th floor. Please contact Rob with any questions or concerns. ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery - Still need air balance report to final out units, 4th foor units okay except for 410, 401. 705 okay as well
|
Final | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | PEND |
Chad Schwendiman
|
|
|
Request for final inspection on 6th and 7th floors, except 610 and 710. Please contact Rob ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - Still need air balance reports to be able to final rooms out. 7th floor east rooms okay except for 705, 710, 734. 6th floor east rooms okay except 610, 634. 5th floor rooms okay except for 501, 510, 514, 520, 534. corridoor
|
Rough-in | 12/29/2017 | 12/29/2017 | 12/29/2017 | P | PASS |
Chad Schwendiman
|
|
|
request for R/I inspection on live works. Please contact Rob with any questions or concerns ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery
|
Rough-in | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | PASS |
Troy James
|
|
|
Request for R/I inspection 3rd floor Community Room 321. Please contact Rob with any questions or concerns. ###-####. Phone #: ###-#### Inspection requested via web by Heather Gransbery
|
Final | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | PART |
Troy James
|
|
|
Request for final 7th floor utility room. Please contact Rob ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery
|
Rough-in | 12/8/2017 | 12/8/2017 | 12/8/2017 | P | FAIL |
Chad Schwendiman
|
|
|
Request for inspection Community Room RM 321. Please contact Rob ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - Need to complete sealing duct work. need supports on duct work need angle on fire damper
|
Rough-in | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | PASS |
Chad Schwendiman
|
|
|
request for ceiling inspection. Please contact Rob, ###-####, with any questions or concerns. If possible, AM inspection, missed deadline by 5 minutes. Phone #: ###-#### Inspection requested via web by Heather Gransbery - okay to cover ceilings in the live work units on 5th street side
|
Conference | 11/6/2017 | 11/6/2017 | 11/6/2017 | A | CANC |
Chad Schwendiman
|
|
|
Rob ###-####
|
Rough-in | 10/10/2017 | 10/11/2017 | 10/11/2017 | A | PASS |
Chad Schwendiman
|
|
|
Request for inspection 3rd floor R/I. Please contact Juan, ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - 3rd floor apartments okay
|
Rough-in | 10/4/2017 | 10/5/2017 | 10/5/2017 | A | PART |
Ben Livingston
|
|
|
Request for inspection 3rd floor. Please contact job lead, Rob, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery All rooms on 3rd floor accept 306
|
Rough-in | 9/25/2017 | 9/26/2017 | 9/26/2017 | A | CANC |
Chad Schwendiman
|
|
|
request for inspection on MA shaft. Please contact Rob ###-#### with any questions or concerns. Phone #: ###-#### >> Inspection requested via web by Heather Gransbery Inspection cancelled from web by: Heather Gransbery
|
Rough-in | 9/25/2017 | 9/25/2017 | 9/25/2017 | A | PART |
Chad Schwendiman
|
|
|
Request for MA shaft inspection and inspection on 4th Floor apts. Please contact Rob ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - 4th floor apartments okay. Need to install fire/smoke dampers prior to rough in
|
Rough-in | 9/25/2017 | 9/25/2017 | 9/25/2017 | A | CANC |
Chad Schwendiman
|
|
|
Request for inspection 4th floor apts. Please contact Rob, ###-#### with any questions or concerns. Phone #: ###-#### >> Inspection requested via web by Heather Gransbery Inspection cancelled from web by: Heather Gransbery
|
Rough-in | 9/21/2017 | 9/21/2017 | 9/21/2017 | A | CANC |
Chad Schwendiman
|
|
|
Rob ###-####
|
Rough-in | 9/19/2017 | 9/19/2017 | 9/19/2017 | P | PASS |
Chad Schwendiman
|
|
|
Request for R/I inspection 4th floor. Please contact Rob ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - 4th floor units 02, 04, 06, 07, 09, 10, 11, 12, 14, 16, 18, 21, 22
|
Rough-in | 9/18/2017 | 9/18/2017 | 9/18/2017 | A | PASS |
Chad Schwendiman
|
|
|
request for r/I inspection 4th and 5th floors. Please contact Rob, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - 5th floor Units 07, 01, 21, 22 4th floor units 01, 05, 08 13, 15 17, 19, 20
|
Rough-in | 9/14/2017 | 9/14/2017 | 9/14/2017 | A | CANC |
Ben Livingston
|
|
|
Request for R/I 5th floor. Contact job lead, Rob, ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery
|
Rough-in | 9/12/2017 | 9/13/2017 | 9/13/2017 | A | PART |
Ben Livingston
|
|
|
R/I inspection 5th floor. Please contact job lead, Rob, ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery rooms 502,504,506 okay
|
Rough-in | 9/7/2017 | 9/7/2017 | 9/7/2017 | P | PART |
Ben Livingston
|
|
|
request for inspection, 5th Floor. Please contact Rob, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery 505,506,519 okay
|
Rough-in | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | PASS |
Chad Schwendiman
|
|
|
Request for r/I above ceiling inspection on 2nd floor and 5th floor. Please contact Rob, ###-####, with questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - 5th floor units 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 20
|
Rough-in | 8/31/2017 | 9/1/2017 | 9/1/2017 | A | PASS |
Chad Schwendiman
|
|
|
request for 7th floor inspection. Please contact Rob, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - 722, 721
|
Rough-in | 8/30/2017 | 8/31/2017 | 8/31/2017 | P | PASS |
Chad Schwendiman
|
|
|
Request for R/I 7th floor inspection. Please contact Rob, ###-####. with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery sub duct shaft 32 seal and caulk
|
Rough-in | 8/28/2017 | 8/29/2017 | 8/29/2017 | A | PASS |
Chad Schwendiman
|
|
|
Request for R/I 7th Floor apts. Contact Rob, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - 7th floor units 10, 12, 14, 16, 17, 18, 19, 20 okay to cover
|
Rough-in | 8/24/2017 | 8/25/2017 | 8/25/2017 | A | PASS |
Chad Schwendiman
|
|
|
Request for R/I inspections 7th floor apartments. Please call Rob ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - 7th floor units 9, 11, 13, 15 okay to cover
|
Rough-in | 8/22/2017 | 8/23/2017 | 8/23/2017 | A | PASS |
Chad Schwendiman
|
|
|
Request for east side of building 4-7th inspection on shafts. Please contact Rob, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - subduct shaft 21 complete
|
Rough-in | 8/22/2017 | 8/22/2017 | 8/22/2017 | A | PASS |
Chad Schwendiman
|
|
|
Request for inspection on 4-7th shafts, east side of building. Please contact Rob, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - Sub duct shaft 21 seal & caulk okay
|
Rough-in | 8/15/2017 | 8/15/2017 | 8/15/2017 | A | PART |
Troy James
|
|
|
Request for inspection on 2nd Floor shaft. Please call Juan ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery Ok access doors to shaft 5th and broad corner. Framing is required to be done per manufacturer instructions for the second level shaft. supply and exhaust duct.
|
Rough-in | 8/4/2017 | 8/7/2017 | 8/7/2017 | P | CANC |
Chad Schwendiman
|
|
|
Request for shaft inspection 3rd through 7th floors. Please contact job lead Rob, ###-####, with any questions or concerns. Inspection requested via web by Heather Gransbery
|
Rough-in | 8/4/2017 | 8/7/2017 | 8/7/2017 | A | PASS |
Chad Schwendiman
|
|
|
Request for shaft inspection 3rd through 7th floor. Please contact job lead Rob, ###-####, with any questions or concerns. Inspection requested via web by Heather Gransbery - sub duct sahft 5 complete
|
Rough-in | 8/4/2017 | 8/4/2017 | 8/4/2017 | P | PASS |
Chad Schwendiman
|
|
|
Request for inspection floors 3 through 7 shaft. Please contact job lead, Rob, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - sub duct shaft 5 seal and caulk okay
|
Rough-in | 8/3/2017 | 8/4/2017 | 8/4/2017 | A | PASS |
Chad Schwendiman
|
|
|
Request for inspection on 6th Floor Apts. Please contact job lead, Rob, with any questions or concerns###-####. Phone #: ###-#### Inspection requested via web by Heather Gransbery - okay to cover units 602, and 606
|
Rough-in | 8/3/2017 | 8/3/2017 | 8/3/2017 | P | CANC |
Chad Schwendiman
|
|
|
Request for inspection on 6th Floor Apts. Please contact job lead, Rob, with any questions or concerns. ###-#### Phone #: ###-#### >> Inspection requested via web by Heather Gransbery Inspection cancelled from web by: Heather Gransbery
|
Rough-in | 8/3/2017 | 8/3/2017 | 8/3/2017 | A | PASS |
Chad Schwendiman
|
|
|
R/I AM inspection request for 6th floor. Job lead contact is Rob Campbell ###-#### Phone #: ###-#### Inspection requested via web by Jess Wigley - ceiling okay to cover in unit 615
|
Rough-in | 8/1/2017 | 8/2/2017 | 8/3/2017 | P | PASS |
Chad Schwendiman
|
|
|
Request for cover inspection on 6th floor rooms. Please contact job lead, Rob, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - okay to cover ceilings in units 604, 607, 608, 611, 613
|
Rough-in | 7/27/2017 | 7/27/2017 | 7/27/2017 | P | PASS |
Chad Schwendiman
|
|
|
Request for inspection on 3rd -7th Floor shafts. Please contact Rob ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - sub duct shafts complete 1,4,6,25 3rd through 7th floors. ceilings okay to cover in 609, 612, 614
|
Rough-in | 7/26/2017 | 7/27/2017 | 7/27/2017 | A | CANC |
Chad Schwendiman
|
|
|
Request for shaft inspection 3rd Floor through 7th Floor. Please contact Rob, ###-####, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery
|
Rough-in | 7/25/2017 | 7/26/2017 | 7/26/2017 | A | PASS |
Chad Schwendiman
|
|
|
Request for inspection on 3rd -7th Floor shafts. Please contact Rob ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - Sub duct shafts seal and caulk oaky on 4,6,1,25 3rd floor though 7th. sub duct shafts complete on 7,9,24,23 3rd floor through 7th.
|
Rough-in | 7/24/2017 | 7/25/2017 | 7/25/2017 | A | CANC |
Chad Schwendiman
|
|
|
Request for inspection on 3rd -7th Floor shafts. Request for above ceiling inspection on 6th Floor apartment. Please contact job lead, Rob, ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery
|
Rough-in | 7/24/2017 | 7/24/2017 | 7/24/2017 | A | PASS |
Chad Schwendiman
|
|
|
Sub duct shafts from 3rd floor to 7th floor seal and fire caulk okay units 9,7,6,4,3,2,1,22,23,24. Mian shaft okay to cover o 3rd, 4th, 5th, and 6th floor.
|
Rough-in | 7/14/2017 | 7/14/2017 | 7/14/2017 | A | PASS |
Ben Livingston
|
|
|
R/I inspection on shaft 3 through 7th floors. Please contact job lead, Rob, with any questions or concerns. ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery subduct liner 11 complete 3rd to 7thfloor
Inspection copied from MEC16-05130
|
Rough-in | 7/13/2017 | 7/14/2017 | 7/14/2017 | A | PART |
Ben Livingston
|
|
|
R/I inspection on shaft 3 through 7th floors. Please contact job lead, Rob, with any questions or concerns. ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery subduct liner 8,10 complete subduct 11 seal and caulk 3rd to 7th floor
Inspection copied from MEC16-05130
|
Rough-in | 7/13/2017 | 7/13/2017 | 7/14/2017 | A | PART |
Ben Livingston
|
|
|
R/I inspection on shaft 3 through 7th floors. Please contact job lead, Rob, with any questions or concerns Phone #: ###-#### Inspection requested via web by Heather Gransbery subduct liner 8,10 seal and caulk okay subduct liner 12,14, 13,15 17 19 complete 3rd floor to 7th
Inspection copied from MEC16-05130
|
Rough-in | 7/12/2017 | 7/12/2017 | 7/12/2017 | A | PART |
Ben Livingston
|
|
|
R/I inspection on shaft 3 through 7th floors. Please contact job lead, Rob, with any questions or concerns Phone #: ###-#### Inspection requested via web by Heather Gransbery shaft liner 20,18,16 complete shaft liner 12,14,19 seal and caulk
Inspection copied from MEC16-05130
|
Rough-in | 7/10/2017 | 7/11/2017 | 7/11/2017 | A | NR |
Ben Livingston
|
|
|
R/I inspection on shaft 3 through 7th floors. Please contact job lead, Rob, with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery
Inspection copied from MEC16-05130
|
Rough-in | 7/10/2017 | 7/10/2017 | 7/10/2017 | A | PART |
Ben Livingston
|
|
|
R/I inspection on shaft 3 through 7th floors. Please contact job lead, Rob, with any questions or concerns. ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery subduct rooms 20,18,16,15 3rd floor to 7th seal and firecaulk inside okay rooms 17,19 exhaust duct 3rd floor to 7th ok to start subduct ** Inspection copied from MEC16-05130
|
Mec-Aging Inspection | 7/6/2017 | 7/6/2017 | 7/6/2017 | | CANC |
Chad Schwendiman
|
|
|
|
Issue PAID IN FULL permit | | | 12/7/2016 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/7/2016 | | DONE |
|
|
|
This permit was created on the web by Heather Gransbery
|
First Notice | 3/7/2018 | 3/7/2018 | | | |
Chad Schwendiman
|
|
|
|
First Notice | 1/17/2018 | 1/17/2018 | | | |
Chad Schwendiman
|
|
|
|