Final | 3/1/2017 | 3/1/2017 | 3/1/2017 | P | PASS |
Ben Livingston
|
|
|
According to the appliance guys, all units either have internal regulators or they have them installed or do not need them at this project. Thanks Phone #: ###-#### Inspection requested via web by MICHAEL BYERS
|
Final | 2/27/2017 | 2/28/2017 | 2/28/2017 | A | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by MICHAEL BYERS tie down restraint for fryer needs to be fastended to the wall, there is no regulator before gas valve on this appliance
|
Pressure Test | 2/21/2017 | 2/21/2017 | 2/21/2017 | P | PASS |
Ben Livingston
|
|
|
Cook wall pressure test Phone #: ###-#### Inspection requested via web by MICHAEL BYERS 20lb gas cook line
|
Pressure Test | 2/1/2017 | 2/1/2017 | 2/1/2017 | A | PASS |
Ben Livingston
|
|
|
pressure test for pizza oven only, so they can cover wall. i will have to call the gas piping at the cook line back in for another time. thanks Phone #: ###-#### Inspection requested via web by MICHAEL BYERS 20 lb gas pizza oven
|
Pressure Test | 1/30/2017 | 1/31/2017 | 1/31/2017 | A | FAIL |
Ben Livingston
|
|
|
two pressure tests 0ne by the pizza oven up front and one on the existing cook line in the kitchen Phone #: ###-#### Inspection requested via web by MICHAEL BYERS pizza oven gauge didnt zero out, cooking line gauge at zero
|
Issue PAID IN FULL permit | | | 1/30/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 1/30/2017 | | |
|
|
|
|
Application received | | | 1/30/2017 | | DONE |
|
|
|
This permit was created on the web by MICHAEL BYERS
|
First Notice | 3/1/2017 | 3/1/2017 | | | |
Ben Livingston
|
|
|
|