Final | 4/25/2017 | 4/25/2017 | 4/25/2017 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dave sorensen
|
Final | 4/21/2017 | 4/24/2017 | 4/24/2017 | A | FAIL |
Brian Scoles
|
|
|
Inspection requested via web by dave sorensen- need approved manual J onsite- need uv protection on line set at A/C- need to insulate 6" fresh air to R/A plenum
|
Rough-in | 2/2/2017 | 2/2/2017 | 2/2/2017 | P | PASS |
Brian Scoles
|
|
|
Pressure And flu test // Dave Phone #: ###-####- R/I ok- 20lb gas and 5lb flue pass- contractor will resubmit Manual J and have at final for equipment changes
|
Application received | | | 2/2/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/2/2017 | | DONE |
|
|
|
|