Final | 4/20/2018 | 4/20/2018 | 4/20/2018 | P | PASS |
Ben Livingston
|
|
|
|
Mec-Aging Inspection | 3/5/2018 | 3/5/2018 | 3/5/2018 | | PART |
Eric Strole
|
|
|
wip
|
Final | 12/4/2017 | 12/4/2017 | 12/4/2017 | A | PART |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Aaron Allred temp C.O.
|
Final | 12/1/2017 | 12/1/2017 | 12/1/2017 | P | NR |
Eric Strole
|
|
|
Lyman Phone #: ###-####-All equipment needs operational. All access doors for fire/smoke dampers need installed and labeled and corridor needs balance for final.
|
Final | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | PART |
Ben Livingston
|
|
|
Lyman Phone #: ###-#### 201 - 220
|
Rough-in | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | PASS |
Ben Livingston
|
|
|
Lyman Phone #: ###-#### duct mounted access doors 5th to 2nd floor corridors
|
Final | 11/28/2017 | 11/29/2017 | 11/29/2017 | A | CANC |
Eric Strole
|
|
|
Lyman Phone #: ###-####-Changed to PM
|
Rough-in | 11/28/2017 | 11/28/2017 | 11/28/2017 | P | PASS |
Eric Strole
|
|
|
Lyman Phone #: ###-####-5th flr fire/smoke dampers in shaft angle pass.
|
Final | 11/28/2017 | 11/28/2017 | 11/28/2017 | A | PART |
Ben Livingston
|
|
|
411-420, 311-320 okay
|
Rough-in | 11/27/2017 | 11/28/2017 | 11/28/2017 | A | PASS |
Ben Livingston
|
|
|
Aaron Phone #: ###-#### none 5th floor chase fire damper clearence okay
|
Rough-in | 11/24/2017 | 11/24/2017 | 11/24/2017 | P | PASS |
Ben Livingston
|
|
|
Lyman-dampers above ceiling Phone #: ###-#### 2nd 3rd 4th floor fire damper angles okay, duct access doors still need to be installed
|
Rough-in | 11/22/2017 | 11/22/2017 | 11/22/2017 | P | PART |
Chad Schwendiman
|
|
|
fire damper spacing // Lyman Phone #: ###-#### - clearances on fire/smoke dampers okay on 2nd, 3rd, and 4th floors
|
Rough-in | 11/21/2017 | 11/22/2017 | 11/22/2017 | A | FAIL |
Ben Livingston
|
|
|
lyman Phone #: ###-#### need clearance on fire smoke dampers in shaft walls 2nd,3rd 4th 5th floors
|
Final | 11/21/2017 | 11/21/2017 | 11/21/2017 | P | PART |
Ben Livingston
|
|
|
Lyman Phone #: ###-#### rooms 301 - 310 , 511 - 520 okay
|
Final | 11/14/2017 | 11/15/2017 | 11/15/2017 | A | PART |
Ben Livingston
|
|
|
Lymn Phone #: ###-#### 501 - 510 401 - 410 okay, need dryer vent length label on final
|
Rough-in | 11/15/2017 | 11/15/2017 | 11/15/2017 | A | PASS |
Ben Livingston
|
|
|
Lymn Phone #: ###-#### 511-520 wet switch okay
|
Rough-in | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | PART |
Brian Scoles
|
|
|
Lyman Phone #: ###-####- room 501-510 condensate and wet switches install ok to cover- room 411-420 condensate and wet switches installed ok to cover-room 311-320 condensate and wet swithces installed ok to cover- room 201-210 condensate and wet switches installed ok to cover- talked about framing around fire dampers in shaft, framing incomplete
|
Rough-in | 11/10/2017 | 11/13/2017 | 11/13/2017 | A | PART |
Brian Scoles
|
|
|
Above ceiling inspection Phone #: ###-#### Inspection requested via web by Aaron Allred- 2nd and 3rd floor corridor ok to cover/ install ceiling tiles- rooms 301-310 condensate and wet switches installed ok to cover- rooms 401-410 condesate and wet switches installed ok to cover- went over shaft wall framing around fire dampers
|
Rough-in | 9/20/2017 | 9/20/2017 | 9/20/2017 | P | PART |
Eric Strole
|
|
|
lobby on 1st & duct & exhaust fans - 2nd fl - Lyman Phone #: ###-####-Fire/smoke dampers angle 2nd flr east side corridor, duct seal east side and corridor and lobby pass.
|
Rough-in | 9/12/2017 | 9/13/2017 | 9/13/2017 | A | PASS |
Ben Livingston
|
|
|
Corridor fire dampers - Lyman Phone #: ###-#### 3rd and 4th floor corridor firedamper angles okay 2nd floor corridor fire dampers clearance okay 18" and 19" round fire damper clearance okay 1st floor lobby fire damper clearance and angles okay
|
Rough-in | 9/7/2017 | 9/7/2017 | 9/7/2017 | P | PART |
Eric Strole
|
|
|
4th flr corridor fire/smoke damper clearances pass.
|
Rough-in | 9/6/2017 | 9/6/2017 | 9/7/2017 | P | FAIL |
Eric Strole
|
|
|
level 3 & 4 fire dampers //Anthony Phone #: ###-####-3rd flr corridor fire/smoke dampers clearances pass. 4th flr corridor fire/smoke dampers fail.
|
Rough-in | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | FAIL |
Eric Strole
|
|
|
Fire/smoke damper inspection 3dr & 4th flr.-Fire/Smoke dampers fail.4th flr corridor ducts need sealed.
|
Rough-in | 9/5/2017 | 9/5/2017 | 9/5/2017 | P | PART |
Eric Strole
|
|
|
Anthony Phone #: ###-####-Duct seal in soffits in units 311 thru 320 pass.
|
Rough-in | 8/29/2017 | 8/29/2017 | 8/29/2017 | P | PART |
Eric Strole
|
|
|
Anthony Phone #: ###-####-5th flr fire/smoke dampers for corridor pass. Still need wall framed for 2 fire/smoke dampers in shaft.
|
Rough-in | 8/15/2017 | 8/16/2017 | 8/16/2017 | A | PART |
Eric Strole
|
|
|
Units 411 to 420 Phone #: ###-#### Inspection requested via web by Aaron Allred-Rough-in in units 411 thru 420 pass.
|
Rough-in | 8/10/2017 | 8/10/2017 | 8/10/2017 | P | PASS |
Ben Livingston
|
|
|
Anthony Phone #: ###-#### 5th floor 511-520 okay 5th floor corridor fire/smoke dampers clearances and angle, shaft wall remains, also need access doors
|
Conference | 8/1/2017 | 8/2/2017 | 8/2/2017 | A | DONE |
Eric Strole
|
|
|
Anthony Phone #: ###-####-Conferance on fire/smoke dampers
|
Rough-in | 7/20/2017 | 7/21/2017 | 7/21/2017 | A | PART |
Ben Livingston
|
|
|
Duct inspection 201-210 Phone #: ###-#### Inspection requested via web by Aaron Allred duct in rooms 201-210 ok
|
Rough-in | 7/12/2017 | 7/13/2017 | 7/13/2017 | A | PART |
Eric Strole
|
|
|
duct insp for rooms 301-310 // Anthony Phone #: ###-####-Duct seal units 301 thru 310 pass.
|
Rough-in | 6/20/2017 | 6/21/2017 | 6/21/2017 | A | PART |
Ben Livingston
|
|
|
Unit 41-410 and units 301-310 Phone #: ###-#### Inspection requested via web by Aaron Allred 301-310 not ready,,,, 401-410 okay
|
Rough-in | 6/2/2017 | 6/2/2017 | 6/2/2017 | P | PASS |
Ben Livingston
|
|
|
Inspections to cover drops. Phone #: ###-#### Inspection requested via web by Aaron Allred units 501,510 soffits okay
|
Rough-in | 5/19/2017 | 5/19/2017 | 5/19/2017 | P | PART |
Eric Strole
|
|
|
Butterfly backdraft dampers on 5th Floor Phone #: ###-#### Inspection requested via web by Aaron Allred-Dampers have been installed.
|
Rough-in | 5/16/2017 | 5/17/2017 | 5/17/2017 | A | PART |
Eric Strole
|
|
|
8 units on 5th floor. Phone #: ###-#### Inspection requested via web by Aaron Allred Units 501,503,505,506,507,508,509,510 Duct seal pass. Need to install backdraft dampers in all fresh air ducts into return air plenum.
|
Rough-in | 5/11/2017 | 5/12/2017 | 5/12/2017 | A | FAIL |
Eric Strole
|
|
|
Corrections not complete
|
Rough-in | 5/11/2017 | 5/11/2017 | 5/11/2017 | P | FAIL |
Eric Strole
|
|
|
Duct inspection for 5 units Phone #: ###-#### Inspection requested via web by Aaron Allred-Neeed to support and seal ducts inunits 501 thru 505.
|
Rough-in | 3/29/2017 | 3/29/2017 | 3/29/2017 | P | PART |
Eric Strole
|
|
|
Line sets and Dryer vents for rooms 201-210, 301-310, and 401-410 Phone #: ###-#### Inspection requested via web by Aaron Allred-Units 201 thru 210, 301 thru 310 & 401 thru 410 in-wall dryer vents and linesets inwall and in ceiling pass.
|
Rough-in | 3/21/2017 | 3/21/2017 | 3/21/2017 | A | CANC |
Ben Livingston
|
|
|
Line set inspection. Phone #: ###-#### Inspection requested via web by Aaron Allred 501-510 dryer vent and lineset prerock rough-in okay
|
Pressure Test | 3/20/2017 | 3/21/2017 | 3/21/2017 | P | CANC |
Eric Strole
|
|
|
Line set inspection. Phone #: ###-#### Inspection requested via web by Aaron Allred
|
Issue PAID IN FULL permit | | | 3/15/2017 | | DONE |
|
|
|
|
Application received | | | 3/14/2017 | | DONE |
|
|
|
This permit was created on the web by Aaron Allred
|
First Notice | 4/20/2018 | 4/20/2018 | | | |
Ben Livingston
|
|
|
|