Final | 5/26/2017 | 5/30/2017 | 5/30/2017 | A | PASS |
Brian Scoles
|
|
|
Re-Inspection Final JR: ###-#### Adam: ###-#### Access: 5233 Phone #: ###-#### Inspection requested via web by Frank Marturello
|
Final | 5/25/2017 | 5/26/2017 | 5/26/2017 | A | FAIL |
Brian Scoles
|
|
|
Access Code: 5233 Adam: ###-#### Phone #: ###-#### Inspection requested via web by Frank Marturello-need uv protectin on line set at A/C- need drip leg installed on water heater between shutoff valve and appliance- 6" fresh air needs insulated- missing fire caulk around b vent at ceiling level in furnace room- left correction front of furnace
|
Rough-in | 3/24/2017 | 3/27/2017 | 3/27/2017 | A | PASS |
Brian Scoles
|
|
|
Re-insp Rough In Shaun: ###-#### Phone #: ###-#### Inspection requested via web by Frank Marturello
|
Rough-in | 3/23/2017 | 3/24/2017 | 3/24/2017 | A | FAIL |
Brian Scoles
|
|
|
JR: ###-#### Phone #: ###-#### Inspection requested via web by Frank Marturello- need approved manual J onsite
|
Pressure Test | 3/23/2017 | 3/24/2017 | 3/24/2017 | A | PASS |
Brian Scoles
|
|
|
JR: ###-#### Phone #: ###-#### Inspection requested via web by Frank Marturello- 20lb gas pass- 5lb flue pass
|
Issue PAID IN FULL permit | | | 3/23/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/23/2017 | | DONE |
|
|
|
This permit was created on the web by Frank Marturello
|