Final | 7/5/2017 | 7/7/2017 | 7/7/2017 | P | PASS |
Troy James
|
|
|
Don Ingram ###-#### Phone #: ###-#### Inspection requested via web by Sheldon Lebow
|
Rough-in | 6/6/2017 | 6/7/2017 | 6/7/2017 | A | PASS |
Brian Scoles
|
|
|
Don Ingram. 3 Fireplaces re-inspect Phone #: ###-#### Inspection requested via web by Sheldon Lebow
|
Rough-in | 6/2/2017 | 6/5/2017 | 6/5/2017 | P | FAIL |
Brian Scoles
|
|
|
Inspection requested via web by Sheldon Lebow- corrections not made
|
Rough-in | 6/2/2017 | 6/2/2017 | 6/2/2017 | P | FAIL |
Brian Scoles
|
|
|
3 Fireplaces Rough In Phone #: ###-#### Inspection requested via web by Sheldon Lebow- need insulation shield in attic on both b vent penetrations- framing needs 1/2" clearance to combustibles level 1 living room fireplace- contractor will cut framing per conversation
|
Issue PAID IN FULL permit | | | 6/2/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/2/2017 | | DONE |
|
|
|
This permit was created on the web by Sheldon Lebow
|