Final | 7/10/2017 | 7/11/2017 | 7/11/2017 | A | PASS |
Brian Scoles
|
|
|
Would like to request first thing Tuesday morning. Thank you Phone #: ###-#### Inspection requested via web by Teresa Costello
|
Final | 7/10/2017 | 7/10/2017 | 7/10/2017 | P | FAIL |
Brian Scoles
|
|
|
Late afternoon if at all possible Phone #: ###-#### Inspection requested via web by Teresa Costello- fresh air to R/A plenum needs insulated- need approved manual J onsite
|
Rough-in | 6/6/2017 | 6/6/2017 | 6/6/2017 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Teresa Costello- need 1" clearance to sheetrock above water heater on b vent by final- call BJ and let him know
|
Pressure Test | 6/6/2017 | 6/6/2017 | 6/6/2017 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Teresa Costello- 20lb gas pass
|
Issue PAID IN FULL permit | | | 6/6/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/6/2017 | | DONE |
|
|
|
This permit was created on the web by Teresa Costello
|