Final | 8/28/2017 | 8/28/2017 | 8/28/2017 | A | PASS |
Brian Scoles
|
|
|
|
Conference | 8/25/2017 | 8/28/2017 | 8/28/2017 | A | CANC |
Brian Scoles
|
|
|
Will Phone #: ###-####- should have been final
|
Rough-in | 6/8/2017 | 6/8/2017 | 6/8/2017 | P | PASS |
Brian Scoles
|
|
|
Will Phone #: ###-####- equipment will set on final
|
Rough-in | 6/7/2017 | 6/7/2017 | 6/7/2017 | P | FAIL |
Brian Scoles
|
|
|
Will-furnace on back order will have inspected at final Phone #: ###-####- crawl needs completed- registers installed and mastic to floor- need Y branch on supply insulated in attic between bed #3 and 4 in attic- dryer vent needs nail plates both sides, this is coming up in a 3.5" wall??- left correction notice on supply at furnace- no equipment set
|
Pressure Test | 6/7/2017 | 6/7/2017 | 6/7/2017 | P | PASS |
Brian Scoles
|
|
|
Will-furnace on back order will have inspected at final Phone #: ###-####- 20lb gas pass
|
Application received | | | 6/7/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/7/2017 | | DONE |
|
|
|
|