Final | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN
|
Rough-in | 7/19/2017 | 7/19/2017 | 7/19/2017 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN- fire damper and angles ok- ok to cover
|
Rough-in | 7/19/2017 | 7/19/2017 | 7/19/2017 | A | PASS |
Brian Scoles
|
|
|
sheetrock and framing on fire dampers ok- ok to install angles- need to inspect angles after installed will do afternoon today
|
Conference | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | DONE |
Brian Scoles
|
|
|
look at fire dampers on fresh air-###-#### Dave general or felix- talked with Felix about installing fire dampers per manufacture install manual- went over details with him- will need opening framed out and sheetrock with clearances- damper needs to be in a sleeve- accress door- will need to inspect framing and clearances around sleeve before angles can be installed
|
Rough-in | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN- see notes on conference
|
Rough-in | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | NR |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN- installers installing fire dampers now- need fire damper installation instructions onsite- will coordinate with Felix for next inspection
|
Rough-in | 7/10/2017 | 7/10/2017 | 7/10/2017 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN- need to submit plan mods on outside air and exhaust fans to city of boise- will need these for inspection next time- this is all waiting on for rough in inspection
|
Conference | 6/29/2017 | 6/30/2017 | 6/30/2017 | A | PART |
Brian Scoles
|
|
|
Call Rob for time to meet Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN- discussed outside air and exhaust fan details- need engineering signed off on both- talked with Rob and Dave about this
|
Rough-in | 6/26/2017 | 6/27/2017 | 6/27/2017 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN- need to install fresh air per approved plans- need to install exhaust fans per approved plans- talked with Tony about revisions needed onsite- correction notice front window west side
|
Rough-in | 6/14/2017 | 6/14/2017 | 6/14/2017 | P | NR |
Brian Scoles
|
|
|
Job Contact Felix ###-#### Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN- exhaust fans need to be installed per revised drawings per detail on sheet MA1-2- talked with tony about getting revised drawings onsite to do inspection
|
Issue PAID IN FULL permit | | | 6/14/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/14/2017 | | DONE |
|
|
|
This permit was created on the web by GREGORY ANDERSEN
|
First Notice | 1/5/2018 | 1/5/2018 | | | |
Chad Schwendiman
|
|
|
|