Final | 12/4/2017 | 12/4/2017 | 12/4/2017 | P | PASS |
Brian Scoles
|
|
|
thank you Phone #: ###-#### Inspection requested via web by Aaron Alandt
|
Rough-in | 7/26/2017 | 7/27/2017 | 7/27/2017 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Welgan
|
Rough-in | 7/25/2017 | 7/26/2017 | 7/26/2017 | A | FAIL |
Brian Scoles
|
|
|
EARLY AM IF POSSIBLE PLEASE TAHNK YOU Phone #: ###-#### Inspection requested via web by Ben Welgan- insulation shield needs 1" clearance to b vent and secured- 6" fresh air blocked by b vent to R/A plenum for tie in
|
Pressure Test | 7/25/2017 | 7/26/2017 | 7/26/2017 | A | PASS |
Brian Scoles
|
|
|
EARLY AM IF POSSIBLE PLEASE TAHNK YOU Phone #: ###-#### Inspection requested via web by Ben Welgan- 20lb gas pass- 5 lb flue pass
|
Rough-in | 7/24/2017 | 7/25/2017 | 7/25/2017 | A | NR |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Welgan- still working on crawl
|
Pressure Test | 7/24/2017 | 7/25/2017 | 7/25/2017 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Welgan- gas guage at zero- 5lb flue pass
|
Issue PAID IN FULL permit | | | 7/17/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/17/2017 | | DONE |
|
|
|
This permit was created on the web by Ben Welgan
|