Final | 10/13/2017 | 10/13/2017 | 10/13/2017 | P | PASS |
Chad Schwendiman
|
|
|
Oleg Phone #: ###-####
|
Final | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | FAIL |
Chad Schwendiman
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak - Gas piping not complete, need combustion iar to furnace and water heater, missing exhaust fans, missing R/A grill in 1st floor
|
Fees Due Hold | 8/31/2017 | 8/31/2017 | 9/10/2017 | | DONE |
|
|
|
|
Rough-in | 8/4/2017 | 8/4/2017 | 8/4/2017 | P | PASS |
Brian Scoles
|
|
|
R/I ok- Fireplace R/I ok
|
Rough-in | 8/3/2017 | 8/4/2017 | 8/4/2017 | A | FAIL |
Brian Scoles
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- need approved resubmitted manual J onsite to do inspection- Fireplace R/I ok
|
Rough-in | 8/2/2017 | 8/2/2017 | 8/2/2017 | P | FAIL |
Brian Scoles
|
|
|
MEC Phone #: ###-#### Inspection requested via web by Oleg Chervak- dryer vent can not be ran in a 3.5" wall needs to maintain 4" round- R/A size does not match manual J on furnace shows 20" round not 16" round thats ran now and shows 12" in master bedroom coming off 20" round- crawl space needs completed-b vent exterior of house needs framing completed and clearance to b vent- left correction notice on front door window
|
Pressure Test | 8/2/2017 | 8/2/2017 | 8/2/2017 | P | PASS |
Brian Scoles
|
|
|
Inspection requested via web by Oleg Chervak- 20lb gas pass
|
Issue PAID IN FULL permit | | | 8/2/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/2/2017 | | DONE |
|
|
|
This permit was created on the web by Oleg Chervak
|