Final | 12/20/2017 | 12/21/2017 | 12/21/2017 | A | PASS |
Brian Scoles
|
|
|
Final - Call Mark Phone #: ###-#### Inspection requested via web by Brandon Sorensen- final ok- occupancy card signed
|
Final | 12/4/2017 | 12/5/2017 | 12/5/2017 | A | FAIL |
Brian Scoles
|
|
|
Final - Call Mark Phone #: ###-#### Inspection requested via web by Brandon Sorensen- need to support 10" duct for pit exhaust going up wall- tube heater needs to be installed per manufactures instruction, termination wrong- reinspection needed after completed- talked to Mark onsite about issues
|
Final | 11/20/2017 | 11/22/2017 | 11/22/2017 | A | FAIL |
Chad Schwendiman
|
|
|
final - call Mark Phone #: ###-#### Inspection requested via web by Brandon Sorensen - Need 1" clearance between b-vent and insulation shield on tube heater. Need venting instructions on site for tube heater, and unit heater. Need supports on CO exhaust up wall.
|
Final | 11/13/2017 | 11/13/2017 | 11/13/2017 | P | PART |
Brian Scoles
|
|
|
b vent ran- combustion air installed- need to finish venting on tube heater- need to install unit heater- need air balance and CO system documentation onsite to final out- need 6" transfer in laundry to lobby for make up air for dryers- Temp occupancy ok
|
Final | 11/9/2017 | 11/9/2017 | 11/9/2017 | P | PART |
Brian Scoles
|
|
|
final - call mark Phone #: ###-#### Inspection requested via web by Brandon Sorensen- need upper/lower combustion air to furnace closet- needs b vent thru ceiling tiles in furnace closet- need pit exhaust 10' away or 3' above air intakes- no occupancy til both mech permits have R/I completed and inspections done- Mark knows went over with him about issues
|
CHANGE STATUS TO (ISS) | | | 11/9/2017 | | DONE |
Christina Prado
|
|
|
Permit finaled by mistake
|
Rough-in | 9/18/2017 | 9/19/2017 | 9/19/2017 | A | PART |
Brian Scoles
|
|
|
Cover - call mark Phone #: ###-#### Inspection requested via web by Brandon Sorensen- need to complete fluing to both furnaces- need dryer venting completed- ok to cover rooms that was discussed with Dale- reinspection needed after corrections are completed
|
Rough-in | 8/15/2017 | 8/15/2017 | 8/15/2017 | P | PART |
Brian Scoles
|
|
|
courtesy sealer inspection for wrap Phone #: ###-#### Inspection requested via web by Brandon Sorensen- seal on duct ok- ok to insulate
|
Rough-in | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | PART |
Brian Scoles
|
|
|
cover inspection call mark Phone #: ###-#### Inspection requested via web by Brandon Sorensen- 3 south bathroom/shower ok to cover ceiling
|
Rough-in | 8/2/2017 | 8/3/2017 | 8/3/2017 | A | PART |
Brian Scoles
|
|
|
cover - wall inspection for dryer venting Phone #: ###-#### Inspection requested via web by Brandon Sorensen- 3 dryer vents ok to cover with sheetrock- CO detection system ok- received pics and UL listing on pipe
|
Issue PAID IN FULL permit | | | 8/2/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/2/2017 | | DONE |
|
|
|
This permit was created on the web by Brandon Sorensen
|
First Notice | 12/21/2017 | 12/21/2017 | | | |
Brian Scoles
|
|
|
|